Gite des Reves

Gite des Reves Join us on our journey from complete shell of a house to beautiful rental accommodation with 360 degree mountain views.
(1)

Plan d’eau - 3 lakes - 1 for fishing, 1 for swimming and 1 for water sports. 15 minute drive from the gite ❤️
21/03/2021

Plan d’eau - 3 lakes - 1 for fishing, 1 for swimming and 1 for water sports.

15 minute drive from the gite ❤️

New week and more work ploughing on in the gite .... more studwork and Kev has insulated and boarded what will be a buil...
08/02/2021

New week and more work ploughing on in the gite .... more studwork and Kev has insulated and boarded what will be a built in wardrobe for bedroom 2.

If we’ve learnt anything so far, it’s that old french houses are bloody freezing and so they need a lot of insulation!!

Before and after photos of what will be the kitchen. Wall down, ceiling down to reveal original oak beams. Work been goi...
30/01/2021

Before and after photos of what will be the kitchen. Wall down, ceiling down to reveal original oak beams. Work been going on behind the scenes on the electrics too.

Last photo is the latest delivery of 100 lengths of locally sourced timber ready for more renovations 🇫🇷🏔

edit: wood which we had to pull in to the house through the open window in the pouring rain ☔️ 😳😜💪🏻💪🏻

2nd bedroom timber frame on 1 of its interior walls. Exterior walls in an old french house are made of thick stone but i...
20/01/2021

2nd bedroom timber frame on 1 of its interior walls.

Exterior walls in an old french house are made of thick stone but interior ones are very thin! So we are using acoustic insulation on these walls. 🔨🇫🇷💪🏻🏔🏚 🪵

18/01/2021

Just a quick video to show you the work being done today ! 🔨🧱💪🏻

Destruction day!! 🔨 🧱 This false wall was put up decades ago between our house and the gite to make an inheritance “fair...
18/01/2021

Destruction day!! 🔨 🧱

This false wall was put up decades ago between our house and the gite to make an inheritance “fair” between 2 brothers! The window you can see was cut in half and one side bricked up!!

Well today it comes down to enlarge the gite kitchen and a stud wall will be created for the new entrance hall and downstairs WC. Exciting times!!! 🤩🇫🇷😍

Moving forward with the downstairs corridor today; insulation complete on the walls and ceiling stud work in progress. 2...
14/01/2021

Moving forward with the downstairs corridor today; insulation complete on the walls and ceiling stud work in progress.
2nd picture is an example of the architectural lighting that will be installed in the gite 🥰🇫🇷💪🏻

Despite it being snowy and cold the work must continue! A good push again today getting in the studs to accommodate the ...
13/01/2021

Despite it being snowy and cold the work must continue!
A good push again today getting in the studs to accommodate the 100mm insulation to keep our guests toasty warm in the winters ❄️🥰

Ploughing on with the cutting and installing of the insulation in the corridor and both bedroom ensuites. Stairs being b...
12/01/2021

Ploughing on with the cutting and installing of the insulation in the corridor and both bedroom ensuites.
Stairs being boarded and timber framework created ready for sound insulation board.
Next step..... electrics! 💪🏻🇫🇷🥰

Work still ploughing on despite minus temperatures! Stud work built and door hung for the staircase down in to the basem...
11/01/2021

Work still ploughing on despite minus temperatures!

Stud work built and door hung for the staircase down in to the basement - which will house the games room and sauna.

Upstairs a fresh delivery of insulation and work going on to insulate the en-suite bathrooms.

09/01/2021

This memorial in the village remembers the 6 young victims of N**i shooting on 4/5 July 1944.
Lest we forget ...

No chilling out here.... bedroom 1 stud wall created and door hung. Pic 2 is a new sloping roof for the stairway. 💪🏻🇫🇷❄️
08/01/2021

No chilling out here.... bedroom 1 stud wall created and door hung. Pic 2 is a new sloping roof for the stairway. 💪🏻🇫🇷❄️

Today’s progress in bedroom 2; stud work done and door hung for the ensuite bathroom. Powering through 💪🏻
06/01/2021

Today’s progress in bedroom 2; stud work done and door hung for the ensuite bathroom.
Powering through 💪🏻

Today’s progress in bedroom 1. Stud work complete and door hung, insulation started. 💪🏻
05/01/2021

Today’s progress in bedroom 1. Stud work complete and door hung, insulation started. 💪🏻

Work began today using the local timber. Bedroom 1 - the frame shown is in position for the ensuite bathroom. 👍
04/01/2021

Work began today using the local timber. Bedroom 1 - the frame shown is in position for the ensuite bathroom. 👍

Exciting day!! Delivery day of 88 lengths of locally sourced timber to start creating some stud walls
04/01/2021

Exciting day!! Delivery day of 88 lengths of locally sourced timber to start creating some stud walls

Beautiful Annecy, the largest city in the Haute-Savoie department of South Eastern France. Nicknamed “the Pearl of the F...
03/01/2021

Beautiful Annecy, the largest city in the Haute-Savoie department of South Eastern France. Nicknamed “the Pearl of the French Alps”, Annecy is just 20 mins from Gite des Reves 🥰🇫🇷

Work has begun at the gite! First job, ripping down the ceiling in what will be the lounge area to reveal the original O...
03/01/2021

Work has begun at the gite!
First job, ripping down the ceiling in what will be the lounge area to reveal the original Oak wood beams.... 🇫🇷🥰

Adresse

Bellecombe En Bauges
Lescheraines
73340

Site Web

Notifications

Soyez le premier à savoir et laissez-nous vous envoyer un courriel lorsque Gite des Reves publie des nouvelles et des promotions. Votre adresse e-mail ne sera pas utilisée à d'autres fins, et vous pouvez vous désabonner à tout moment.

Contacter L'entreprise

Envoyer un message à Gite des Reves:

Vidéos

Partager


Autres Location de maisons de vacances à Lescheraines

Voir Toutes