Great end to the week on the Wigston loft, 1st fix electrics in, floor down, walls up and boards going on ready for the plasterers next week.
Queniborough! It was a pleasure, what an amazing space that’s going to make a huge difference for this family allowing all the kids to have their own bedrooms now that they are getting older, and what what an en suite! Walking into that shower will only make your morning better.
What a great first week on the wigston loft, 15 meters long! Beams and joists in and loaded up ready for next week.
Day 8
Chimney down, beams and floor in, dormer built and old roof stripped out, next insulation and stairs.
Great 1st day on the Queniborough loft, roof stripped and covered in, steel, skip, timber delivered and loaded up, hangers on, pockets chopped out, coffee drank, chimney down tomorrow and joists in, weather’s looking good to 👍🏻
Clean down before scaffolding comes down.
Absolute pleasure walking Back on site today after after @midlands_plastering_services , all doorframes spotless, no lumps to knock off at skirting line, whole place swept and hovered and most importantly a great finish, all ready for 2nd fix joinery, electrics and plumbing.
Stair day, and a milestone in the loft conversion process, it means the customer can finally come up and see the new space, always a exciting time.
End of week 3 on the westcotes loft, outside fully lathed and felted ready for slating, inside windows measured up to be made, all insulation completed and signed off by building control, quick sweep and all ready for next week, stairs, stud walls, plumbing / electric 1st fix and brick gables built.
Great end to week two on the westcotes loft, dormer built and covered in, old roof of inside taken down.
Start of week two,not a bad days work in between showers whole front pitch on, covered in and dormer framework up.
Macy giving me a hand to get the new van ready for the week ahead and the start of a new loft conversion.