Kellec Networking & Electrical

Kellec Networking & Electrical Our projects. American Holidays, Fonua, Fonfix, Digi Com, Software Support. Advance Systems. Allianz, KSN.Downer int. Niteline. Cubic Telecom. SHS Bray.

Today’s project. Eurosales phase 2.Full strip down. New Switches, firewall and cloud key. New servers, NAS and UPS.
28/07/2024

Today’s project. Eurosales phase 2.
Full strip down. New Switches, firewall and cloud key.
New servers, NAS and UPS.

Today’s project for MCA Architects. Removal of the old servers and switches. Full strip down and rebuild of the network....
27/07/2024

Today’s project for MCA Architects.
Removal of the old servers and switches. Full strip down and rebuild of the network. A nice challenge.

Today’s tidy up project for Eurosales Ringsend and part of a three week IT upgrade.
21/07/2024

Today’s tidy up project for Eurosales Ringsend and part of a three week IT upgrade.

This weekend’s challenge for Garland Dublin. Install of a new fire wall, POE switches and 4 LR WiFi access points. Full ...
26/05/2024

This weekend’s challenge for Garland Dublin. Install of a new fire wall, POE switches and 4 LR WiFi access points. Full strip down, and rebuild of the comms cabinets.

Todays project for Glencree centre for peace and reconciliation. Mapping the network, removing old switches, install new...
20/05/2024

Todays project for Glencree centre for peace and reconciliation. Mapping the network, removing old switches, install new firewall and switches.

Todays project. A network rebuild and tidy up for ATC Bray. Work in progress, we’ve still got to install some new kit. N...
13/01/2024

Todays project. A network rebuild and tidy up for ATC Bray. Work in progress, we’ve still got to install some new kit. New switch and server on the way.

Today’s project. Removing the old server, UPS. Strip down and repatch of the network and installing the router aNd firew...
30/09/2023

Today’s project. Removing the old server, UPS.
Strip down and repatch of the network and installing the router a
Nd firewall into the cabinet.

A nice little challenge.

This weekend’s project for Conaty foods. Strip out and rebuild the network. Install new switches. Move firewall and rout...
03/09/2023

This weekend’s project for Conaty foods. Strip out and rebuild the network. Install new switches. Move firewall and routers.
Remove old server and move the new servers.
An enjoyable challenge.

Install of a new 42U cabinet and rebuild of the fibre and LAN network.
08/08/2023

Install of a new 42U cabinet and rebuild of the fibre and LAN network.

A nice Saturday project.
08/08/2023

A nice Saturday project.

08/08/2023
DairyGlen. Comms and server area tidy up. New POE switch installed.
04/03/2023

DairyGlen. Comms and server area tidy up.
New POE switch installed.

Another challenge.
28/11/2022

Another challenge.

Today’s project, for Mike Murphy Insurance. Install a new larger and deeper comms cab, install the new switches, cable m...
26/11/2022

Today’s project, for Mike Murphy Insurance. Install a new larger and deeper comms cab, install the new switches, cable management and re patch. Also a strip out of the main comms cab redundant kit.

Today’s project. Not an easy one as this was a live upgrade !! nothing like a challenge.
11/11/2022

Today’s project. Not an easy one as this was a live upgrade !! nothing like a challenge.

Today’s project. Haydon Chartered. Coms cab 1, Re- patched and tidied up. Coms cab 2, Old servers and redundant kit remo...
22/10/2022

Today’s project. Haydon Chartered. Coms cab 1, Re- patched and tidied up.
Coms cab 2, Old servers and redundant kit removed, new server and switch installed.

Today’s project for Mc Cambridge Bread.  Coms tidy up. Server tidy up, router and firewall moved into a secure cabinet.
27/08/2022

Today’s project for Mc Cambridge Bread.
Coms tidy up. Server tidy up, router and firewall moved into a secure cabinet.

19/07/2022

Kapilarna vlaga karakteristična je za stare objekte građene bez temelja i vodonepropusnih materijala. 🏚

Ako se ne ukloni iz zidova na vrijeme, kroz određeno vrijeme uzrokuje raslojavanje i uništavanje materijala zidova. 💦

PROsystem djeluje na temelju elektroosmoze i uspješno se upotrebljava za rješavanje kapilarne vlage već godinama. 🏠

Ovaj sistem eliminacije je iznimno brz i efikasan, a prvi efekti mogu biti vidljivi već nekoliko dana nakon instalacije sustava. ✅

Više o PROsystemu pročitajte na našoj web stranici ili nas kontaktirajte:
https://bit.ly/PROsystem 🔍
📩 [email protected]
☎ 01 388 77 99

Address

Bray

Alerts

Be the first to know and let us send you an email when Kellec Networking & Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Share