Most of the ceilings installed on the interior of the main structures. The tile work has started with the bathrooms in the main house and the leveling for the floor tile is underway. The gutters are being painted and prepped for installation.
Additionally, the septic system rough dig is complete and the rock/gravel leach field area is in place. More tiling and work on the septic for the remainder of this week!