I installed this tile about 25 years ago still looks great like it’s brand new customer called me back. She wants me to take it all out and put new tile. I said OK Tile and floated floors this week Monday. I’ll go back and finish floating Tuesday start laying tile Job for Gary Casey at his house
We started this job on Monday? Went to lawn texas. We went over there to remove laminate flooring 1800 ft.² of it had to go through the house and float. The floors floors are very uneven. We also laid 8 inch wide by 4 foot plank throughout the house and it was vinyl. We’ll go back Monday and get after it again hoping to be done with this job by Thursday of this coming week, so far customers are very happy
This job was over on Western Plains and Randy customers hired somebody to go in and redo. Their show got paid never came back and finished five months down the line. They call me to help them . Went over and looked at it gave him a bid I went back Friday and tore The shower, bottom poor workmanship 2 x 4 for curbs asking for trouble. we glue down the drain first after that we install the shower pan and install hardy backer and install tile the walls. and float shower floor went back to next day blade rock for decorative and shower walls and insert laid rock shower floor tow customer I would be back the following Saturday to finish. This was a side job went back Friday and clean shower first then grouted shower walls finish the job. Custom is happy got paid.
Went out to Clyde, Texas, and did a kitchen backsplash. We started it yesterday. I went back today and grouted and put the plug plates back on. Customer was very happy and got paid.
We’re doing this job for Gary Casey Casey tile Carpet one we had to go to Acu and tear out the fiberglass shower had a crack on the floor base. We tour out the fiberglass shower and installed hardy backer, sealed the corners with 4 inch nylon mash and floated the floor. We start tiling the shower tomorrow.
I went to Acu to do some towel repair in the kitchen. Had to tear up some Cory tile and replace it. I was able to save some of the tile and reuse it and use some other Cory tile to finish up the job job completed.
I went to Acu to do some towel repair in the kitchen. Had to tear up some Cory tile and replace it. I was able to save some of the tile and reuse it and use some other Cory tile to finish up the job job completed.
I started this job on South 20th and Postoak on Monday morning we remove wood plank tile from the hall bath and master bath. We also removed 18 x 18 tile from kitchen dining small hallway that goes from back door to garage guest bath and utility room after that we had to remove the black adhesive off floor so our tile will burn to the concrete and not the existing adhesive waiting on the tile to come in
We started this job on Monday morning on the corner of South 20th and Postoak we remove wood tile from Hall bath and master bathroom floor removed an 18 x 18 tile from the hall kitchen dining small hall that goes from back door to the garage and a utility room After that, we had to remove the black adhesive off the floor so we could install our tile and tile bond to concrete existing he that’s already there this job for Gary Casey and Casey town corporate waiting on the tile to come in. Should be in today I’ll go back tomorrow and start tiling the floor
Thursday I went to Mesa Ridge Estates at the gated community and did some repair on some pool rock was loose. Remove it reinstalled it and grouted the joints and then I I put down duck tape on rock and up against concrete and sealed it with a poly blend cock Completed paid
I went and did some tile repair over on saddle Creek removed cracked tiles replace them with some new ones turn around and grout and sealed floor job completed got paid
Today was my last day out in Haskell Texas. I went and grouted the shower, put the showerhead and scutcheon and faucet handle on. I installed the glass door. I installed the commode. Customer was very happy I got paid.
I went to Haskell, Texas to tear out some tile from a shower and wainscoting Customer was very unhappy with the work that had been done. as I tore out the shower, I found multiple mistakes. Curb was built at a two by fours wrong way to installer curb screws below the concrete. He also installed a hey clampdown drain as you can see in my video the clapped down part that holds the shower pan together is nowhere in sight. He just cut around drain and added red guard and thought that would work. Also had to vacuum all the trash he left in the Drain also had to remove some 2 x 4 plates that were rotted out. I had to redo all the 2 x 4 on the jams nothing was straight customer was unhappy With the shower valve he installed. She had me remove it and reinstall new one she did not want anything. The last guy did in her house I’ll go back we put hardy backer up, seal our corners and install tile.
I started this job last week on Meadow Drive. It was a tub with two steps we removed it had to move plumbing over to the center of the floor . And build a petition wall had plumbing done on the wall installed shower pan installed hardy backer, red guarded window to waterproof. It installed tile in shower build seat and shower. Installed one by one octagon tile in bathroom area. I’ll go back Monday and finish it up and get paid.
I did this job on South 20th I started Monday I remove popcorn off the ceilings floated the ceilings flat sanded them tomorrow go back and should light texture. Customers are so happy right now I’ll get paid tomorrow.
I’ve been doing a lot of repair work for people I did some soffit work. I did some patch up texturing In this house, customers were happy I got paid