We started this job Monday morning at Wister nursing home on South 32nd. We’re telling their kitchen area we had to grind adhesive off the floor float the floors install 6 x 6 Cory we’ll go back Monday and try to finish the rest of it. Hopefully be out of there by Wednesday.
I did this repair off Madison Avenue in Abilene Texas. Customer had deteriorated window seals and termite damage. We remove baseboard sheet rock and window trim. Replaced two by fours sheet rock everything tape in bed and float install on new trim new baseboard paint wall and paint trim customer was happy I got paid
We went out to Ballinger, Texas, and did two bathroom floors. We remove carpet and tax strip and pad. Hall bath didn’t need no cleaning master bath had pain all over we had to grind floor to install tile removed to commode and reinstalled to commode grouted reattach carpet in master bathroom bedroom and two closets Job completed customer happy we did this job through Angie’s list. Thank you Angie for sending me work job complete got paid.
How many did this job about Ballinger Texas through Angie’s list we remove carpet out of two bathrooms clean the floors installed the 12 x 24 and one bathroom and an 18 inch tile and another reattach carpet installed commode job completed customer happy I got paid onto the next one thank you God, God first
We started this job on Monday morning on Madison Street in Abilene, Texas. We are out of shower lotta termite damage. We had to replace two by fours had to work on the drain and installed a new drain closed. Everything up started laying tile finish laying tile yesterday. I’ll go back today and grout. We should be done with this job today then we go to Ballinger after this job customer very happy I get paid today.
We did this job 5361 Encino we had to grind black asbestos off the floor clean floor up. Lotta cracks on the floor. We use red guard on the cracks as crack. Suppressor helps. Keep the tile from cracking installed all tile grouted job completed. customer very happy. I got paid onto the next one.
Did this job on Hunters Glen? We tore out the shower They had 4 1/4 tile we put a 12 x 24 tile built to seat installed shower door. Customer was happy we got paid.
Start this job this morning we tore out a shower that was leaking. The job was on Hunters Glen. The shower so had two by fours for curb and removed all that built a curb out a brick like it should be preloaded the floor, Go back tomorrow and install shower pan close it up and start installing tile thank you God
I did this job this weekend. I went and moved all the trash that was in the kitchen area small kitchen hammer down to now some nails floated the floor and cut my door jams and laid the laminate install quarter round job completed
Finally completed this job I’ve been on it for three weeks floor had a big crack on it very uneven had to floated level with a slider material and then lay the tile job completed