Dedication to our craft and the pursuit of perfection is always at the forefront of what we do. Working with trade partners that share that same enthusiasm is core to who we are as builders.
9pm and the steel mono stringers are installed at the new HQ. Check out that connection 🖤
Stair Design & Fabrication: @costafabrications
Woodwork: Patrick Farrington
Progress update back at the new HQ.
Walking from the hallway that leads to the showroom and 2nd floor mill shop takes us to the office section of the building. The inner core is intentionally lighter than the outer core. Our meeting/conference room is dark with natural light flooding in through the skylight and will be finished with white contemporary furnishings.
•Finishing touches are underway to the interior painting phase in preparation for our Sprinkler team, LIfe Safety, Electricians and Plumbers.
• All interior door jambs and protected and the doors will remain off until our trade partners are complete.
• Up next is the custom steel stairs from in the foyer with rift and quarter white oak floating threads.
• Getting close to the finish line.
Architect: @high_rock_design
Interior Design: @amylynn_interiors
Builder: @mccormackbuilders
The Queen Anne Victorian Build.
Completion is within sight for this incredible property.
Design: @zekebrownbfa
Builder: @mccormackbuilders
Many hands make light work.
📍Queen Anne Victorian Build - Phase 2
Design: @zekebrownbfa
Builder: @mccormackbuilders
Pool Plastering at The Queen Anne Victorian Build
An array of slings, ropes, pulleys and a whole bunch of craftsmen.
Looking to build that dream pool?
At McCormack Builders we got you covered!
Design: @zekebrownbfa
Pool Plaster: Kadison Pool Plastering
Builder: @mccormackbuilders
Providing the proper environment for trades to do their work efficiently is paramount to the success of our projects. None more so than the painting phase.
A dust free space is a provided to all our painters along with no other trades allowed in that space.Detailed schedules are printed and posted on site for all painter’s to access which avoids any potential confusion. Let’s do it right the first time, every time.
Interior Design: @amylynn_interiors
Builder: @mccormackbuilders
Final preparations for the asphalt binder course at the new HQ.
At the new headquarters we intentionally designed each staff space to be unique and uplifting.
The staff print room is furnished with high gloss metallic inspired millwork and Taj Mahal countertops flooded with natural light from a Velux roof light.
Interior Design: @amylynn_interiors
Millwork: @wooddecorinc
Stone: @onyxmarblegranite
There is just something so rewarding about the plaster phase of a project!
Interior Design: @amylynn_interiors
Builder: @mccormackbuilders
Millwork installation progress at the New HQ.
Welcome to our Principal’s office with custom walnut millwork.
Interior Design: @amylynn_interiors
Custom Millwork: @wooddecorinc
Builder: @mccormackbuilders
Phase 2 Progress Update from our Queen Anne Victorian Build.
Design: @zekebrownbfa
Builder: @mccormackbuilders
Mineral Wool in every wall & ceiling at our Boston Penthouse Renovation ensuring a safe and comfortable environment for our clients.
Interior Design: @amylynn_interiors
Builder: @mccormackbuilders
A little over 4 months since we started the metal framing on our Boston Waterfront Penthouse renovation we are ready to in move to blueboard and plaster.
Carful planning combined with a detailed schedule of works on the pre construction side ensure we hit our targets not just some of the time but every time. A credit to all the team involved especially our Senior Project Manager Ryan conducting this entire orchestra with nothing but finesse!
Design: @amylynn_interiors
PM: @ryandonahue1428
Builder: @mccormackbuilders
Installation progress of the new 1” high performance glass throughout our Boston Penthouse Renovation.
Design: @amylynn_interiors
Glazing: A&A Window Products
PM: @ryandonahue1428 McCormack Builders
Builder: @mccormackbuilders
Another milestone at the new headquarters. Final coat of epoxy will be installed today with our trade partners Boston Garage. Next up we will continue with the pine cladding on the lower level with board and plastering commencing on the upper level next week.
Have a great weekend and Easter blessings to all.
Architect: @high_rock_design
Interior Design: @amylynn_interiors
Epoxy: @boston_garage
Pine Vendor: @pondershollowflooring
Builder: @mccormackbuilders
The Primary Bathroom at The Queen Anne Victorian.
Design: @zekebrownbfa
Builder: @mccormackbuilders
Teamwork is what we are all about.
Assisting our electrical contractor ROM Electrical Inc. in pulling our underground service almost 250’ from the building to the disconnect.
Saving backs one job at a time! @caterpillarinc
Builder: @mccormackbuilders