Ideal Building

Ideal Building Ideal Building is a full service General Contractor that has extensive experience in new construction

01/07/2024
All walls taken out, sheetrock started, floors waiting for final coats.  Had to go out of order a bit, cabinets are bein...
12/26/2022

All walls taken out, sheetrock started, floors waiting for final coats. Had to go out of order a bit, cabinets are being delivered on the 3rd and needed floors done first. We will put floor protectant down and then finish sheetrock.

Floor install finished and now sanding and prepping for finish coats.
12/26/2022

Floor install finished and now sanding and prepping for finish coats.

This project will consist of removing chimney in Family room to open it up for bigger kitchen and island.  We will be re...
10/08/2022

This project will consist of removing chimney in Family room to open it up for bigger kitchen and island. We will be removing the two upstairs bedrooms and converting them into new entry way and dining room. To make up for the bedroom loss, we will be converting the existing attached garage into two bedrooms, still leaving them with a 2 car detached garage. New windows, furnace/Ac, flooring cabinets countertops and an updated bathroom on main floor as well.

This project will consist of tearing down an existing shed off property to make way for new addition, tearing off back b...
10/08/2022

This project will consist of tearing down an existing shed off property to make way for new addition, tearing off back bump out from center of back of house, and adding on a 24'x24' Master bedroom, bath and closet. We will also be completely bringing the remaining part of house down to studs, all new electrical, plumbing, insulation, heating, cabinets, etc etc. etc. We are fortunate enough to have a similar project going on literally across the street at the same time. It will be labeled Seahurst 2

This project will consist of adding on to the back of the house a 22'x22' Master bedroom, bathroom closet and laundry ro...
06/02/2022

This project will consist of adding on to the back of the house a 22'x22' Master bedroom, bathroom closet and laundry room as well as creating a new hallway from existing house to new addition. As I wrote in one of the pics, we are fortunate enough to be working on a similar project literally across the street and hope to work these together simultaneously. But, with the new hiccups on the building industry, we will see how smooth it goes.

Small portion of house tore off and ready to lay out for the new foundation
06/01/2022

Small portion of house tore off and ready to lay out for the new foundation

Address

Des Moines, WA

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

+12068781913

Alerts

Be the first to know and let us send you an email when Ideal Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ideal Building:

Videos

Share


Other Des Moines travel agencies

Show All