11/25/2024
We recently completed a driven pipe pile job in Port Gamble for a future pedestrian bridge. The 12" closed ended piles were driven with a Berminghammer 3505 diesel hammer suspended from our Manitowoc 110 Ton lattice boom crawler crane. The dense soils made installation a bit of a challenge on a couple of the piles but in the end we got them all installed on alignment. Good job crew.