Pile Contractors

Pile Contractors For over 30 years Pile Contractors’ specially trained crews have complete in excess of 400 project Pile Contractors, Inc. Trust that Pile Contractors Inc.

has been driving piling and drilling since 1990. For over 20 years Pile Contractors’ specially trained crews have complete in excess of 400 projects using the most up to date equipment and training. The pile driving and drilling specialists at Pile Contractors, Inc. have the most training and experience to handle any specialized foundation project. Our relationship with our customers starts with c

ooperation to meet the needs of the project team. provides timely submittals, value engineering, safety, and attention to detail including prompt response from our principals. We pride ourselves in providing well trained crews, up to date equipment and timely delivery of our services. will provide the most value to your project team. We have the most diverse product inventory in the Industry. We specialize in the following products. Drilled Shafts
Augercast Pile
Driven Pile: Including Sheet Piles, H-Pile, Pipe -Pile, Precast Pile, Concrete Pile and Pin piles. Tiebacks
Soldier Pile Shoring
Soil Nails
Grout Driven Piles

We recently completed a driven pipe pile job in Port Gamble for a future pedestrian bridge. The 12" closed ended piles w...
11/25/2024

We recently completed a driven pipe pile job in Port Gamble for a future pedestrian bridge. The 12" closed ended piles were driven with a Berminghammer 3505 diesel hammer suspended from our Manitowoc 110 Ton lattice boom crawler crane. The dense soils made installation a bit of a challenge on a couple of the piles but in the end we got them all installed on alignment. Good job crew.

It has been a busy Summer/Fall here at Pile Contractors and we recently finished up a contract for Cowlitz County in Cas...
11/13/2024

It has been a busy Summer/Fall here at Pile Contractors and we recently finished up a contract for Cowlitz County in Castle Rock. On this project we were the general contractor and not only built a soldier pile retaining wall but also self performed most of associated work including rebuilding the road, drainage and grading. Crew did a great getting this done efficently.

We just finished up this curved soldier pile wall for a storage facility out in Kingston. Its been a busy summer and the...
09/20/2024

We just finished up this curved soldier pile wall for a storage facility out in Kingston. Its been a busy summer and the crews have been stretched but we have kept everyone happy and on schedule.

Residental Soldier Pile Shoring Wall for an addition. Tough access but the crew nailed it.
07/15/2024

Residental Soldier Pile Shoring Wall for an addition. Tough access but the crew nailed it.

Port of Everett Exxon/Mobil
05/08/2024

Port of Everett Exxon/Mobil

05/08/2024

Port of Everett Exxon/Mobil Sheet Pile Shoring Cell. We are in the midst of installing 550 LF of sheets at the Port of Everett. The Longest sheets are 60' in length and the ground has several layers of extremely hard ground. In the Video we are seen working a sheet up in down to break thru the hard ground. A template holds the wall alignment and keeps the sheets from spreading which increases the friction on the interlock. This can lead to a damaged interlocks and of course increased friction makes getting the sheets to tip elevation more difficult. The template plays a vitial roll in increaseing our production and reducing wear on the sheet piles and equipment. We are over half way done at this point.

We have a Vulcan 1150 Vibratory Hammer with a CAT 175HP power pack that we are ready to let loose. Asking 25K. PM or cal...
04/12/2024

We have a Vulcan 1150 Vibratory Hammer with a CAT 175HP power pack that we are ready to let loose. Asking 25K. PM or call for more information

Kirkland CKC Soldier Pile Wall with 6X Lagging Boards. These heavy 6" thick lagging boards required some innovation to m...
02/24/2024

Kirkland CKC Soldier Pile Wall with 6X Lagging Boards. These heavy 6" thick lagging boards required some innovation to more easily place. We built a steel frame that allowed us to set many lagging boards at once greatly increasing productivity.

Address

Seattle, WA

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm

Alerts

Be the first to know and let us send you an email when Pile Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pile Contractors:

Videos

Share