JZ Construction INC JZ Construction Inc. is a General Contractor/Framing Subcontractor With 22 years plus of residential and commercial construction experience.
(2)

We provide quality services at a competitive cost. Our skilled professionals are available to handle all jobs which include remodels, additions, custom home framing, commercial wood framing, metal stud framing, drywall, sidings, basements, bathroom remodels, custom additions, kitchen remodels, decks, design, painting, from structural repair to multi family litigation settlements. One of the few specializing in building green! James Hardie Fiber Cement Siding
EverGrain Composite Decking

Highlands Ranch remodel. Kitchen backsplash tile and fireplace tile is grouted. Set the new mantle this morning. Next up...
14/06/2024

Highlands Ranch remodel. Kitchen backsplash tile and fireplace tile is grouted. Set the new mantle this morning.
Next up is new vinyl flooring on main floor and appliances

Highlands ranch remodel. Kitchen backsplash and fire place tile complete. Grout tomorrow then new main floor flooring go...
12/06/2024

Highlands ranch remodel. Kitchen backsplash and fire place tile complete. Grout tomorrow then new main floor flooring goes in.

Highlands ranch basement water damaged job is wrapped up.
08/06/2024

Highlands ranch basement water damaged job is wrapped up.

Highlands Ranch remodel. Drywall done. New kitchen countertops installed. Fireplace and kitchen backsplash start Monday.
08/06/2024

Highlands Ranch remodel.
Drywall done. New kitchen countertops installed. Fireplace and kitchen backsplash start Monday.

Highlands Ranch remodel. New fireplace is installed along with new furnace and A/C
05/06/2024

Highlands Ranch remodel.
New fireplace is installed along with new furnace and A/C

Started demo on another remodel in Highlands Ranch. New floors, new fireplace new countertops, new appliances, new furna...
27/05/2024

Started demo on another remodel in Highlands Ranch.
New floors, new fireplace new countertops, new appliances, new furnace and A/C

Putting a basement back together after a pipe burst in the ceiling.
17/05/2024

Putting a basement back together after a pipe burst in the ceiling.

That’s a wrap on the Parker deck.
24/04/2024

That’s a wrap on the Parker deck.

Parker deck. Working on railing and stairs today
15/04/2024

Parker deck.
Working on railing and stairs today

Day 2 on Parker deck. All framed. Tomorrow framing inspection then start installing decking
10/04/2024

Day 2 on Parker deck. All framed. Tomorrow framing inspection then start installing decking

Day one of a new deck out in Parker.
09/04/2024

Day one of a new deck out in Parker.

This one just about wrapped up. 1 more day of electrical and appliances.
28/03/2024

This one just about wrapped up. 1 more day of electrical and appliances.

Busy day on lone Tree remodel. Countertops installed, backsplash tile, stone at fireplace wrapping up stair railing and ...
25/03/2024

Busy day on lone Tree remodel.
Countertops installed, backsplash tile, stone at fireplace wrapping up stair railing and paint.

Lone tree job. New White Oak stair railing installed. Started installing crown molding. Laundry/mudroom turned out nice
18/03/2024

Lone tree job. New White Oak stair railing installed. Started installing crown molding. Laundry/mudroom turned out nice

Lone Tree job. Worked in the mudroom/laundry room today.
14/03/2024

Lone Tree job. Worked in the mudroom/laundry room today.

Just an early spring snow.  Have to keep those schedules
14/03/2024

Just an early spring snow.
Have to keep those schedules

Moving right along with installing cabinets.both bathrooms and kitchen are set. Started laundry/mudroom today. Also temp...
14/03/2024

Moving right along with installing cabinets.both bathrooms and kitchen are set. Started laundry/mudroom today.
Also templates for new countertops today.
Built a new Whate Oak fireplace mantel.

Lone Tree remodel. Got a good jumps on installing new cabinets in main floor powder bath, bar and started the kitchen. A...
11/03/2024

Lone Tree remodel.
Got a good jumps on installing new cabinets in main floor powder bath, bar and started the kitchen. After kitchen is done then install second floor bathroom and mud/laundry room.

Lone tree remodel. Hardwood floors are in and working on the stairs. Cabinets delivery today.
08/03/2024

Lone tree remodel.
Hardwood floors are in and working on the stairs.
Cabinets delivery today.

Lone Tree remodel. 8” prefinished engineered hardwood flooring started going in yesterday
28/02/2024

Lone Tree remodel.
8” prefinished engineered hardwood flooring started going in yesterday

Lone Tree remodel. Mudroom, Powder bath and second floor bath tile is complete. Hardwood floors start Monday
21/02/2024

Lone Tree remodel. Mudroom, Powder bath and second floor bath tile is complete. Hardwood floors start Monday

Lone Tree remodel  Starting laying tile in mudroom and second floor bath
16/02/2024

Lone Tree remodel
Starting laying tile in mudroom and second floor bath

Lone Tree remodel  drywall is installed waiting on the inspect  drywall finishers start tomorrow
05/02/2024

Lone Tree remodel drywall is installed waiting on the inspect drywall finishers start tomorrow

Lone Tree remodel.drywall install today
02/02/2024

Lone Tree remodel.drywall install today

Full house at the Lone Tree remodel. Rough plumbing, HVAC and electrical getting done
25/01/2024

Full house at the Lone Tree remodel. Rough plumbing, HVAC and electrical getting done

This is why I love my job. From clients that we finished their basement
23/01/2024

This is why I love my job. From clients that we finished their basement

Lone Tree remodel. Demo about wrapped up and started framing new walls.
18/01/2024

Lone Tree remodel. Demo about wrapped up and started framing new walls.

Repeat client in centennial   New custom stair railing and new vynal flooring main floor and stairs
18/01/2024

Repeat client in centennial New custom stair railing and new vynal flooring main floor and stairs

Lone Tree remodel. Day one of demo. knocking down some walls
15/01/2024

Lone Tree remodel. Day one of demo. knocking down some walls

Littleton remodel  final coat on new hardwood floors and new stair railing is finished
15/01/2024

Littleton remodel final coat on new hardwood floors and new stair railing is finished

Address

CO

Alerts

Be the first to know and let us send you an email when JZ Construction INC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Shortcuts

  • Address
  • Telephone
  • Alerts
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share