Machining Solutions

  • Home
  • Machining Solutions

Machining Solutions Machining Solutions LLC is a woman owned precision, CNC machine shop offering quality, prototype and production parts.

We are a woman owned machine shop located in Albuquerque NM, providing production or prototype wire EDM, CNC mill and lathe machining. We pride ourselves in competitive pricing, above average quality, aesthetics, customer service and timely delivery. We have a combined machining experience of over 50 years. We are AS9100 compliant, CCR/SAM registered, ITAR & weapons qualified, PQR 1050 certified.

We have a fully implemented quality program with calibration of all test equipment. We offer pedigree packages that include inspection reports, certificate of conformances, material traceability and certification, bonded store and process travelers. We can manufacture your parts from a provided print or solid model of various types using our program software Gibbs Cam or MasterCam.

Machining Solutions has been very busy and appreciate our Customers for their continued trust and confidence in us.
28/05/2015

Machining Solutions has been very busy and appreciate our Customers for their continued trust and confidence in us.

Two new pieces of equipment have hit the floor!
28/05/2015

Two new pieces of equipment have hit the floor!

24/12/2014

Merry Christmas and Happy New Year!

15/12/2014

Merry Christmas! We want to thank Mike, Carla, Faith, Brittany and Crystal for their help in donating food to the under privileged children for Christmas.

26/11/2014

Happy Thanksgiving! We would like to share our thanks and appreciation to our troops fighting for our freedoms past, present and future, for each and every gift God has given us, our Customers and for our family and friends.

05/11/2014

We are looking for machinists who can join the Machining Solutions team. If you are interested or know of someone who may be a fit please let them know.
CNC Machinist – Close tolerance, prototype and production machining- 5-10 years of experience.
Must have ability to program with Gibbs or Mastercam and setup prototype parts on CNC's.
Wire EDM, CNC mill, and CNC lathe knowledge preferred but not required.
NO operators or manual machinists. Pay DOE, a portion of relocation reimbursement possible after hire, for the right candidate. Flexible schedule available.
Please call Machining Solutions LLC at (505) 796-0596 or check us out on our website www.machiningsolutionsnm.com

Stucco, paint, electrical, doors & trim all done. Need to do base boards, fixtures and tie in the plumbing.   Our contra...
27/10/2014

Stucco, paint, electrical, doors & trim all done. Need to do base boards, fixtures and tie in the plumbing. Our contractor told us today that the offices should be done by the end of November.

Sheet rock, tape and grey coat stucco DONE!!!  Texture this week,  doors, paint, tile, color stucco within two weeks.
14/10/2014

Sheet rock, tape and grey coat stucco DONE!!! Texture this week, doors, paint, tile, color stucco within two weeks.

We have insulation, paper and chicken wire for stucco.  Fingers crossed we will be in the new offices by Christmas.
02/10/2014

We have insulation, paper and chicken wire for stucco. Fingers crossed we will be in the new offices by Christmas.

Aluminum bracket
02/09/2014

Aluminum bracket

Lastly gang the building has been slow going, but we have all framing done, windows, 2nd floor with the stairs to get th...
26/08/2014

Lastly gang the building has been slow going, but we have all framing done, windows, 2nd floor with the stairs to get there! We are waiting for an inspection from the County and HVAC to come in so we can get a final on the mechanical stuff.

About half way with the second floor.  Sorry I haven't been able to post some awesome machined parts everything we have ...
28/07/2014

About half way with the second floor. Sorry I haven't been able to post some awesome machined parts everything we have been doing lately is controlled for all to see. Enjoy the latest guard dog and building update.

We have a second floor now.  The framed wall in the front of the picture is where the main entry way will be, with a 20 ...
24/07/2014

We have a second floor now. The framed wall in the front of the picture is where the main entry way will be, with a 20 foot high open ceiling. Stairs should be done today to get to the 2nd floor.

Yesterday the framers finished the offices and put up outer plywood.  Today they should have the subfloor finished and b...
22/07/2014

Yesterday the framers finished the offices and put up outer plywood. Today they should have the subfloor finished and by tomorrow with luck the rest of the upstairs should be complete.

I forgot to show you all how incredible the concrete finishers were.  We had ran a power cord outside for them to do the...
18/07/2014

I forgot to show you all how incredible the concrete finishers were. We had ran a power cord outside for them to do the framing/forming for the concrete. We came in the next day to see the result of us not bringing in said power cord.

The framing has started!  We considered moving our desks out there but one small problem...no electrical yet.  Hopefully...
18/07/2014

The framing has started! We considered moving our desks out there but one small problem...no electrical yet. Hopefully by Saturday afternoon, with a crew of 7 all framing will be done.

WE HAVE CONCRETE!!!
14/07/2014

WE HAVE CONCRETE!!!

Passivated, stainless steel, lathe turned & bored, 4th axis milling for holes & notches.  Side view and top view.
08/07/2014

Passivated, stainless steel, lathe turned & bored, 4th axis milling for holes & notches. Side view and top view.

Still waiting for concrete foundation to be poured.  We are now being held up by Bernalillo County for a compression ins...
08/07/2014

Still waiting for concrete foundation to be poured. We are now being held up by Bernalillo County for a compression inspection before we can pour. It never rains here in Albuquerque but let me tell you when we need inspections and dry dirt the Lord blesses us with rain.

Another step closer to finishing the move in list.  New Machining Solutions building sign is us and looks great!
20/06/2014

Another step closer to finishing the move in list. New Machining Solutions building sign is us and looks great!

Plumbing finished, inspected and should have concrete poured and a completed foundation by next week.  Additional parkin...
17/06/2014

Plumbing finished, inspected and should have concrete poured and a completed foundation by next week. Additional parking should get started within 2 weeks on the Westside of the building. (yes another requirement by Bernalillo County.

The latest work on the new offices.  Wish I was posting that we have our final inspection and are moving in next week.
12/06/2014

The latest work on the new offices. Wish I was posting that we have our final inspection and are moving in next week.

Aluminum 7075-T6, Frame with multiple mill setups, bead blast surface finish. Happy Friday ALL have a great weekend!
06/06/2014

Aluminum 7075-T6, Frame with multiple mill setups, bead blast surface finish. Happy Friday ALL have a great weekend!

YES dirt work has begun!  Hopefully framing will be complete for concrete this week.  To think it has only taken 6 month...
02/06/2014

YES dirt work has begun! Hopefully framing will be complete for concrete this week. To think it has only taken 6 months to get to this point thanks to the lovely organization of Bernalillo County.

29/05/2014

All building permits finally approved for the new offices (6 months later). Should start dirt work next week at the latest. Keep your fingers crossed.

16/05/2014

Wire EDM running aluminum heat sink.

Address

NM

Alerts

Be the first to know and let us send you an email when Machining Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Shortcuts

  • Address
  • Telephone
  • Alerts
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share