25/08/2021
After 40 years and six administrations, the Metro Manila Subway, our country’s first underground railway system, finally started with site-clearing works at the Valenzuela depot. Two out of the 25 massive tunnel boring machines are already in the Philippines for the start of the underground works within 2021.
Finally – a long-term traffic solution that would enable Filipinos to aspire for a better future.
Get to know Sec Art Tugade: https://mb.com.ph/2021/08/25/art-tugade-man-of-action-2/