Tripkoto Travel & Tours

  • Home
  • Tripkoto Travel & Tours

Tripkoto Travel & Tours Tripkoto offers a complete package travel services and your travel coach in getting the most inspiri

https://www.facebook.com/240416092783279/posts/2249083761916492/
04/09/2022

https://www.facebook.com/240416092783279/posts/2249083761916492/

PROPOSED MINDORO-BATANGAS BRIDGE 🇵🇭

The Mindoro-Batangas Floating Bridge, included in the 10 projects of the Marcos administration under PPP, is a 15-km super bridge, with an optional pedestrian/bicycle lane that will link Mindoro Island to the province of Batangas.

The bridge will cover an 8.5-km section from Mindoro Island to Verde Island and a 6.5-km stretch from Verde Island to Batangas over water with a depth of 10m to 300m.

Source: https://www.dpwh.gov.ph/dpwh/ppp/priority

Via Emerging Philippines

08/08/2022

7641 Islands

04/08/2022

A Recipe for a Dream

02/08/2022
https://www.facebook.com/226030990774371/posts/5706080616102687/
31/07/2022

https://www.facebook.com/226030990774371/posts/5706080616102687/

P1.2B SPARK SAMAR SPORTS CITY PROJECT KICKS OFF

The proposed PHP1.2 billion Spark Samar Sports City here is expected to attract major investments and big events in Samar province.

Based on the master plan, the 16-hectare project is with an 8,100 seating capacity stadium, commercial strip, business processing outsourcing hub, residential area, a huge space for greenery, and a track oval and other athletic facilities.

The sports amenities available in the complex include a football and track field, tennis courts, volleyball courts, an aquatics center, a gym, a baseball field, hyper courts, a skatepark, an amphitheater, and a dorm for athletes.

https://www.pna.gov.ph/articles/1179394

© William Ti, Rommel Rutor



https://www.facebook.com/240416092783279/posts/2220051628153039/
28/07/2022

https://www.facebook.com/240416092783279/posts/2220051628153039/

THE NLEX-SLEX CONNECTOR ROAD CALOOCAN INTERCHANGE 🇵🇭🇵🇭🇵🇭

The multi-level NLEX-SLEX Caloocan Interchange along C3 Road, which will serve as strategic converging point of NLEX Harbor Link Segment 10, its C3-R10 Section, and the NLEX Connector, will soon be completed.

It is a section of the 13.24 km long NLEX-SLEX Connector Road, which connects two of Luzon's main expressways. Travel time from SLEX to NLEX or vice versa will be reduced from two hours to just 20 minutes after work is complete.

📷 : Daniel Caleb Villar via Pinoy Joyride, Johnny Khooo

https://www.facebook.com/240416092783279/posts/2203045739853628/
05/07/2022

https://www.facebook.com/240416092783279/posts/2203045739853628/

BIRD'S EYE VIEW OF CEBU-CORDOVA LINK BRIDGE

An aerial photo of Cebu-Cordova Link Expressway (CCLEX), the longest bridge in the Philippines, was captured on Monday.

Uploader Sarah Malang photographed the view using her smartphone as her flight approached the Mactan International Airport.

The 8.5-km CCLEX connects mainland Cebu from Cebu City to Cordova town in Mactan Island.

📸Sarah Malang via Philippine Star
Rising Philippines

https://www.facebook.com/226030990774371/posts/5414362211941197/
20/04/2022

https://www.facebook.com/226030990774371/posts/5414362211941197/

SAVE THE DATE ⭐

President Rodrigo Duterte to lead the opening ceremony of the 8.9-km Cebu-Cordova Link Expressway (CCLEX), on April 27, 2022.

This is also historic as we will commemorate the 501st Victory in Mactan under chieftain Lapulapu over the Spanish armada led by Portuguese explorer Ferdinand Magellan.




© CCLEX

https://www.facebook.com/100067651842656/posts/308932988038427/
06/04/2022

https://www.facebook.com/100067651842656/posts/308932988038427/

MABILIS, LIGTAS, KOMPORTABLE, at higit sa lahat walang 'demons' sa mga tren dahil sa matagumpay na nakumpleto ang rehabilitasyon ng MRT-3. Patuloy pa din ang pag-arangkada ng LIBRENG SAKAY dito hanggang April 30! Kaya't tara, sakay na tayo!

[Photo courtesy: Demon Slayer: Kimetsu no Yaiba: Mugen Train anime/Ufotable]

https://www.facebook.com/226030990774371/posts/5264096996967720/
24/02/2022

https://www.facebook.com/226030990774371/posts/5264096996967720/

FERDINAND E. MARCOS (FEM) STADIUM🇵🇭

Expected Opening: June 2022

Fresh: Construction Update of 12k seating capacity Ferdinand E. Marcos (FEM) Stadium Rehabilitation in Laoag City, Ilocos Norte Province as of February 2022.

© Arjay Angeles



17/02/2022
17/02/2022
https://www.facebook.com/100067651842656/posts/277536387844754/
17/02/2022

https://www.facebook.com/100067651842656/posts/277536387844754/

MODERNO AT BAGONG TREN PARA SA MGA PILIPINO! 🚆🇵🇭

Alam n’yo ba ang mga ganap sa ating Railways Sector?

All aboard at alamin…

Hindi refurbished, hindi donasyon, at hindi galing sa loan o utang - Sa wakas! Matapos ang 50 YEARS, nagkaroon na rin ng bago at modernong tren ang Philippine National Railways (PNR)!

Mula sa dating siyam (9) na tren lamang na lumang-luma, at napag-iwanan na ng panahon, ngayon ay nasa 18 NA TREN ng PNR ang operational, na siyang bahagi ng Re-Fleeting Management Strategy nito.

Samantala, noong Setyembre 2021 ay dumating sa bansa mula sa South Korea ang mga bagong train sets para sa MRT-7. 18 out of 108 rail cars na completely manufactured ang on-site na.

Ang MRT-7, na tumagal ng 20 taon mula nang maisumite ang unsolicited proposal bago magsimula ang aktwal na konstruksyon ng proyekto sa ilalim ng kasalukuyang administrasyon, ay nalalapit ng matapos. Asahan na ang mas mabilis na biyahe dahil nasa 35 minuto na lang aabutin sa pagitan ng Quezon City at San Jose Del Monte, Bulacan. Nasa 300,000 pasahero naman ang maisasakay nito sa unang taon at inaasahang aakyat pa sa 850,000 pagdating ng 12th year nito.

Dumating na rin sa bansa, mula sa Spain at Mexico, ang first batch ng train cars para sa LRT-1 Cavite Extension Project.

Matapos ang 19 years na delay, umaarangkada na ang proyekto, at nalalapit na rin ang pagtatapos nito. Soon, magiging 25 minuto na lamang, mula sa kasalukuyang isang (1) oras at 10 minuto, ang biyahe mula at patungong Baclaran at Niog, Bacoor. Maiaangat din nito ang daily ridership ng linya sa 800,000 pasahero, mula 458,000.

Nasa bansa na rin ang unang 8-car trainset para sa PNR Clark Phase 1 (Tutuban-Malolos) — na bahagi ng massive North-South Commuter Railway (NSCR) Project.

Ang pangalawang trainset naman para sa project ay inaasahang darating sa bansa sa 2nd quarter ngayong taon.

Oras na maging operational ang PNR Clark Phase 1, na kokonekta sa Malolos, Bulacan, at Tutuban, Manila, magiging 35 minuto na lamang ang biyahe, mula sa kasalukuyang isang (1) oras at 30 minuto. Inaasahan din na nasa 300,000 pasahero ang mase-serbisyuhan nito.

Ramdam na rin ang pagbabago sa MRT-3 dahil tumatakbo na sa linya ang mga newly-overhauled light rail vehicles (LRVs), na bahagi ng massive rehabilitation project ng linya.

Gawing kumportable, maginhawa, mabilis, at ligtas ang biyahe ng mga commuter — ito ‘ho ang layunin ng Department of Transportation (DOTr), sa pangunguna ni Secretary Art Tugade, katuwang ang PNR, MRT-3, Light Rail Transit Authority (LRTA), at Light Rail Manila Corporation (LRMC).

Asahang magpapatuloy at mananatiling puspusan ang pagsasakatuparan ng mga proyekto at modernisasyon sa railway sector ng bansa, upang makapaghatid ng PAGBABAGO at PROGRESO para sa mga PILIPINO!

Ito ‘ho ang !

🇵🇭

Address


Website

Alerts

Be the first to know and let us send you an email when Tripkoto Travel & Tours posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Tripkoto Travel & Tours:

Videos

Shortcuts

  • Address
  • Alerts
  • Contact The Business
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share