405 Improvement Project

  • Home
  • 405 Improvement Project

405 Improvement Project Traffic volumes on the I-405 are expected to increase significantly and the population is expected to grow 11 percent by 2040.

Today, the San Diego Freeway (I-405) is one of the most congested freeways in Orange County, carrying more than 300,000 vehicle trips in some sections each day. Orange County Transportation Authority (OCTA) in cooperation with Caltrans is improving 16 miles of the San Diego Freeway (I-405) between State Route 73 (SR-73) and Interstate 605 (I-605). It also will construct the 405 Express Lanes from

SR-73 to I-605. The new express lanes – incorporating the existing carpool lanes and connectors that opened in 2014 – will be two lanes in each direction. Check out the project's "Inside the 405" progress video series: https://bit.ly/405series

⚠️Attention I-405 freeway drivers & community members⚠️ The I-405 Improvement Project is no longer posting weekly constr...
09/03/2024

⚠️Attention I-405 freeway drivers & community members⚠️ The I-405 Improvement Project is no longer posting weekly construction alert reels & the weekly Friday email alerts will no longer be sent out. The closure list is still available on the project website at www.octa.net/405construction.

REMINDER! The I-405 Improvement Project is no longer posting weekly construction alert reels. Beginning mid-March, the w...
02/03/2024

REMINDER! The I-405 Improvement Project is no longer posting weekly construction alert reels. Beginning mid-March, the weekly Friday email alerts will no longer be sent out. The closure list is still available on the project website at www.octa.net/405construction.

Update! The I-405 Improvement Project will no longer be posting weekly construction alert reels. Beginning mid-March, th...
24/02/2024

Update! The I-405 Improvement Project will no longer be posting weekly construction alert reels. Beginning mid-March, the weekly Friday email alerts will no longer be sent out. However, the closure list is still available on the project website at www.octa.net/405construction.

Did you know? To update some of Orange County’s most vital infrastructure, the project contractor used:- 172,000 cubic y...
21/02/2024

Did you know? To update some of Orange County’s most vital infrastructure, the project contractor used:
- 172,000 cubic yards of Redi-Mix concrete
- 360,000 tons of asphalt
- 38,000,000 pounds of bridge rebar

You may have noticed that water is ponding in some ramp areas with the recent rain events. As part of the project, crews...
14/02/2024

You may have noticed that water is ponding in some ramp areas with the recent rain events. As part of the project, crews installed detention & infiltration basins, per Caltrans’s requirements, in these locations to address storm water capacity & water quality. The water is held in the basins & filtered before soaking back into the ground or is released into the storm drain system. The project team continues to monitor the basins to ensure they are working correctly.

Check out Newland Street bridge’s NEW look!This was the last bridge on the project to be demolished for reconstruction.N...
07/02/2024

Check out Newland Street bridge’s NEW look!
This was the last bridge on the project to be demolished for reconstruction.
Newland’s bridge improvements included construction of a new northbound sidewalk, bike lanes in both directions, and two additional vehicle lanes.

McFadden Street bridge was the first on the project to receive demolition construction activities.Upon its reopening in ...
31/01/2024

McFadden Street bridge was the first on the project to receive demolition construction activities.
Upon its reopening in 2020, the bridge unveiled 2 additional vehicle lanes, new bike lanes on both sides and a new eastbound sidewalk!

Have questions about the new 405 Express Lanes? Head to 405expresslanes.com to learn about how to acquire a transponder,...
24/01/2024

Have questions about the new 405 Express Lanes? Head to 405expresslanes.com to learn about how to acquire a transponder, toll policies, and more! 🚘

As we move towards total project completion/closeout, crews continue landscaping throughout the corridor. These shots sh...
17/01/2024

As we move towards total project completion/closeout, crews continue landscaping throughout the corridor. These shots showcase fresh landscaping in the City of Seal Beach.

NEW! The northbound (NB) and southbound (SB) 405 Express Lanes and connectors from I-605, SR-22, and SR-73 will close fo...
12/01/2024

NEW! The northbound (NB) and southbound (SB) 405 Express Lanes and connectors from I-605, SR-22, and SR-73 will close for maintenance.

The closures are anticipated as early as 11 p.m. Friday, Jan. 12, to 6 a.m. Saturday, Jan. 13.

Sign up for project-wide and bridge-specific construction alerts at bit.ly/405-signup.

While remaining open to traffic, the Goldenwest Street and Bolsa Avenue bridges were completely reconstructed. The impro...
10/01/2024

While remaining open to traffic, the Goldenwest Street and Bolsa Avenue bridges were completely reconstructed. The improved bridges now consist of an additional 2-3 lanes of travel, new bike lanes in each direction, and one additional sidewalk!

This   highlights the Slater Avenue bridge. Slater bridge was the first to be completed and reopened to traffic. 🚙      ...
03/01/2024

This highlights the Slater Avenue bridge. Slater bridge was the first to be completed and reopened to traffic. 🚙

27/12/2023

Travel over the NEW 405 Express Lanes with this drone shot of the now open I-405/SR-73 Connector! Be sure to visit 405expresslanes.com to learn more about the Express Lanes.

22/12/2023

From all of us at the 405 Improvement Project, we wish you a joyful holiday season with the ones you love! ✨❄️

There will be no freeway closures from 1 p.m. Friday, Dec. 22, to 10 p.m. Tuesday, Dec. 26.

BIG NEWS! The NEW 405 Express Lanes are anticipated to open Friday 12/1! 🛣️ A FasTrak transponder will be required for a...
27/11/2023

BIG NEWS! The NEW 405 Express Lanes are anticipated to open Friday 12/1! 🛣️

A FasTrak transponder will be required for all vehicles to use the new 405 Express Lanes.

To open a new FasTrak account, visit 405expresslanes.com/en/open-an-account

20/11/2023

To make Thanksgiving travel as smooth as possible, there will be no freeway closures from 1 p.m. Wednesday, Nov. 22, to 10 p.m. Sunday, Nov. 26.

Additionally, there will be no construction activity from Thursday, Nov. 23, to 10 p.m. Sunday, Nov. 26.

We wish you a Happy Thanksgiving! 🦃 🍂

⚠️ The 405 Express Lanes are anticipated to open Friday, Dec. 1! Reminder that testing is still IN PROGRESS. For both cr...
10/11/2023

⚠️ The 405 Express Lanes are anticipated to open Friday, Dec. 1! Reminder that testing is still IN PROGRESS.

For both crew and driver safety, please do not enter the 405 Express Lanes.

For more info on the 405 Express Lanes, visit bit.ly/405expresslanes-faq

09/11/2023

Today, we honor America’s veterans for the sacrifices they made to protect our country and preserve our freedom.
In observance of Veterans Day, there will be no freeway closures from 1 p.m. Thursday, Nov. 9, to 10 p.m. Sunday, Nov. 12. Additionally, there will be no construction activities Saturday, Nov. 11. 🎖️

405 Express Lanes testing is officially underway! Check out our latest video for a helpful breakdown on the related clos...
02/11/2023

405 Express Lanes testing is officially underway! Check out our latest video for a helpful breakdown on the related closures and more information on the future 405 Express Lanes. 🚗 Click here:

Scroll through to see more behind-the-scenes shots before the Newland Street bridge opened September 2023! 👀            ...
27/10/2023

Scroll through to see more behind-the-scenes shots before the Newland Street bridge opened September 2023! 👀

⚠️Attention commuters and travelers! 🚧The existing carpool lanes within I-405 Improvement Project limits will start clos...
26/10/2023

⚠️Attention commuters and travelers! 🚧The existing carpool lanes within I-405 Improvement Project limits will start closing tonight to allow crews to test the NEW 405 Express Lanes.

Tonight, Oct. 25, at 11 p.m., the northbound I-405 carpool lane will close at SR-73. On Nov. 1 at 11 p.m., the carpool lanes in both directions between SR-22 and I-605 as well as the I-605 and SR-22 carpool connectors will also close.

Drivers can expect significant delays throughout the area and are encouraged to use alternate routes if possible and allow for extra travel time.

Once testing is complete, the 405 Express Lanes will open to the public between SR-73 and the Orange County/LA County Line. A FasTrak transponder will be required for all vehicles to use the new 405 Express Lanes. With a switchable FasTrak transponder, vehicles with three or more are always free, two-person carpools are free off-peak, and solo drivers can choose to pay a toll to use the new Express Lanes, which replace the traditional carpool lanes.

In addition to the 405 Express Lanes, the 405 Improvement Project – a centerpiece of OCTA’s Measure M – added one regular lane in each direction, improved interchanges, and rebuilt overpasses with new bike lanes and sidewalks.

For more information about the 405 Express Lanes, please visit: 405expresslanes.com.
County of Orange, California Seal Beach Chamber of Commerce Los Alamitos-Seal Beach Patch Rossmoor, CA Garden Grove City Hall City of Costa Mesa Long Beach City

🚨 The existing carpool lanes within the project limits will close as early as tonight to perform required testing of the...
26/10/2023

🚨 The existing carpool lanes within the project limits will close as early as tonight to perform required testing of the new 405 Express Lanes. 🚨

Closure schedule:
- Northbound (NB) I-405 carpool lane at SR-73 to close 11 p.m. Wed., 10/25

- I-405 carpool lanes between I-605 and SR-22 as well as the I-605 and SR-22 carpool connectors to close 11 p.m. Wed., 11/1.

Drivers can expect significant delays throughout the area and are encouraged to use alternate routes if possible.

During testing, motorists may see test vehicles traveling in the Express Lanes. For the safety of the traveling public and our crews, DO NOT ENTER the Express Lanes.

In addition to the 405 Express Lanes, the 405 Improvement Project – a centerpiece of OCTA’s Measure M – added one regular lane in each direction, improved interchanges, and rebuilt overpasses with new bike lanes and sidewalks.

405 Express Lanes info: bit.ly/405expresslanes-faq

Check out crews inspecting a casing installed on a column under I-405 on Euclid Street! This is one step of seismic retr...
25/10/2023

Check out crews inspecting a casing installed on a column under I-405 on Euclid Street! This is one step of seismic retrofitting a bridge column. 📏 🔍

Today, we’re featuring the transformation of the recently opened and improved Ward Street bridge! This bridge has 2 new ...
23/10/2023

Today, we’re featuring the transformation of the recently opened and improved Ward Street bridge! This bridge has 2 new vehicular lanes, new striped bike lanes, and a new northbound sidewalk.

Valley

Looking for the best way to drive through the project corridor?The OCTA Community Outreach Team partners with the naviga...
20/10/2023

Looking for the best way to drive through the project corridor?

The OCTA Community Outreach Team partners with the navigation app Waze to provide construction alerts and city-approved detours!

We hope everyone is enjoying the ability to safely travel across the freeway by using the Heil Avenue pedestrian bridge....
18/10/2023

We hope everyone is enjoying the ability to safely travel across the freeway by using the Heil Avenue pedestrian bridge. Comment below if you’ve recently walked across it! 🏃‍♀️

For  , we’re featuring the progress made to reconstruct the Magnolia Street bridge in the City of Fountain Valley! This ...
16/10/2023

For , we’re featuring the progress made to reconstruct the Magnolia Street bridge in the City of Fountain Valley! This upgraded bridge reopened to traffic in Spring 2021.

Take a look at these pre- and post-construction shots of the Edwards Street bridge! 🚘
13/10/2023

Take a look at these pre- and post-construction shots of the Edwards Street bridge! 🚘

The newly reconstructed Springdale Street bridge is open to traffic! This wider and taller bridge now includes new sidew...
11/10/2023

The newly reconstructed Springdale Street bridge is open to traffic! This wider and taller bridge now includes new sidewalks and bike lanes.

Scroll through for shots of Goldenwest Street and Bolsa Avenue bridges after the milestone traffic shifts were completed...
29/09/2023

Scroll through for shots of Goldenwest Street and Bolsa Avenue bridges after the milestone traffic shifts were completed! 😍

Address


Alerts

Be the first to know and let us send you an email when 405 Improvement Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Shortcuts

  • Address
  • Alerts
  • Contact The Business
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share