Nexxgen Power Technologies Ltd Earthing Measurement Concept.
The general wearing and weathering effects can reduce the efficiency of a system. And it is therefore prudent and recommended to test the system at plan intervals. It may only take a single faulty joint in a long circuit to eliminate the breaker or fuse to trip during fault.
It may only take one Lightning strike to "glaze" the ground rod(s) and render them ineffective or increase the resistance significantly.
And insufficient capacity (amperage) can only be ensured via testing.
The safety issue is that faulty joints can burn open and leave the exposed parts of the Equipment at this short at a high voltage with respect to Earth. This leaves a shock hazard for the operators of the equipment and render equipment protective devices useless. Remember, impedance will also be affected by the composition, but it takes Nexxgen in-house Crew to rectify the Systems.