Parmasteelisa
- Home
- Parmasteelisa
THE PHILOSOPHY .Full customer satisfaction and top quality performance of our buildings services. BV
Europe
Europe INT. Australia
Iljin-PISA Co. Ltd. HK Ltd.
PERMASTEELISA
Building the Future through
Great Architecture Habitat & Technology
Great Architecture, Habitat & Technology
“ A group of multi-disciplinary teams dedicated to our
collective desire to create a better environment for all who
use and enjoy our buildings of greater external aesthetics
and internal comfort. ”
PERMASTEELISA IIIIIGARTNER
00 INTRODUCTION 00 INTRODUCTION
C
ONTENTS
•
00 Introduction
01 Group Profile
02 Operative Structure
03 Projects Gallery
04 Preliminaryy Projject Review
and Analysis
05 Conclusion
PERMASTEELISA IIIIIGARTNER
00 INTRODUCTION 00 INTRODUCTION
00introduction
00
•
THE MISSION
THE MISSION .Design and build innovative and revolutionary architectural works through new
design and high technology solutions. THE JOURNEY .Started in 1973, Permasteelisa has growth to become a world leader in the
engineering manufacturing and installation of architectural envelopesengineering, manufacturing and installation of architectural envelopes. .Operations in 4 continents of Europe, America, Asia and Australia through more
than 60 companies located in 27 countries. PERMASTEELISA IIIIIGARTNER
00 INTRODUCTION 00 INTRODUCTION
•
00introduction
00
PERMASTEELISA (INDIA) PVT LTD
PERMASTEELISA (INDIA) PVT LTD. Started in 1995, Permasteelisa has grown as an leading façade contractor in India
i th fi ld f i i ft i d it ll i f hit lin the field of engineering, manufacturing and installation of architectural
envelopes. .As part of the Permasteelisa Family, Permasteelisa India was able to deliver the
expertise of world market to Indian clients as well..expertise of world market to Indian clients as well.. PERMASTEELISA IIIIIGARTNER
01 GROUP PROFILE 01 GROUP PROFILE
01
•
01global presence
The Group operates globally with world-wide companies of both directly and indirectly
owned plants. Europe
Gundelfingen (D)
Middelburg (NL)
Vittorio Veneto (I)
Asia
Bangkok (THAI)
Bangalore (IND)
Nth A i Heerlen (NL)
Madrid (E)
San Vendemiano (I)
Wettern (B)
Basel (CH)
Hong Kong (HK)
Shanghai (PRC)
Singapore (SIN)
Beijing (PRC)
North America
Windsor (CT)
Los Angeles (CA)
Miami (FL)
Montreal (QC) Basel (CH)
Budapest (H)
London (UK)
Oslo (N)
Paris (F)
Dubai (UAE)
D**g Guan (PRC)
Kuala Lumpur (MAL)
Manila (PH)
Seoul (SK)
Montreal (QC)
New York (NY)
Johnson City (TN)
Minneapolis (MN) Australia
Melbourne (AUS)()
Rome (I)
Treviso (I)
Rijeka (HR)
Warsaw (PL)
Seoul (SK)
Taipei (TW)
Tokyo (J*P)
Kaoshiung (TW) Project Management
Production Plants
( )
Brisbane (AUS)
Sydney (AUS)
Project Management
Project Management
Production Plants
Research &
Development Center
Project Management
Production Plants
Research &
Development Center
Research &
Development Center
Production Plants
PERMASTEELISA IIIIIGARTNER
01 GROUP PROFILE 01 GROUP PROFILE
01
•
01asia presence
Key events in Permasteelisa
Asia-Pacific:
•
Acquisition of Josef Gartner
Asian Division Group of
Companies
•
NNew ffacttory & t & testt riig iin
Thailand
•
New operations of
Permasteelisa Beijjingg PRC
office, Permasteelisa Macau
Ltd
•
New Research & Engineering
CtCenter iin Asiia-Pacific
A Pifi
Asia
Bangkok (THAI)
Bangalore (IND)
Hong Kong (HK)
Shanghai (PRC) Shanghai (PRC)
Singapore (SIN)
Beijing (PRC)
Dubai (UAE)
D**g Guan (PRC)
Kuala Lumpur (MAL)
Manila (PH)
Seoul (SK)
Taipei (TW)
Australia
Melbourne (AUS)
Tokyo (J*P)
Kaoshiung (TW)
Project Management
Production Plants
Brisbane (AUS)
Sydney (AUS)
Project Management
Research &
Development Center
Project Management
Production Plants IIIIIGARTNER
PERMASTEELISA
01
01 GROUP PROFILE
01group organisation -worldwide.. PERMASTEELISAPERMASTEELISAPERMASTEELISAPERMASTEELISAS.p.A. & INT.BV worldwide
INDUSTRIAL PARTNERS &
INVESTORS
LUXEMBOURG HOLDINGS
(HB+BP)
Operative Partners
Permasteelisa Pacific PermasteelisaEurope Permasteelisa Pacific
Holdings Ltd
(Asia & Australia)
Permasteelisa
USA Inc.S.p.A & INT. BVItaly SpA India Asia Australia America
PERMASTEELISA IIIIIGARTNER
01
01 GROUP PROFILE
01group organization – pacific holdings ltd.. PERMASTEELISAPERMASTEELISAPacific Holdings Ltd (SINGAPORE)
Japan & Korea
Permasteelisa Ltd. (Japan)
Shanghai Permasteelisa
Ahit t P d t
China South-East Asia
Permasteelisa Pte Ltd. (Si )
Australia
Permasteelisa PTY Ltd. Ltd
(Korea)
(Japan)
Gartner Japan K.K. (Japan)
Architecture Products
Co. (China)
Gartner Contracting Co. (China)
Gartner Contracting Pte Ltd. (Singapore)
(Singapore)
India
Australia
Permasteelisa Ltd. (India)
(Korea)
Permasteelisa Ltd. (Hong Kong)
Permasteelisa Ltd. (Macau)
Josef Gartner & C
Josef Gartner Curtain
wall Co. (China) Permasteelisa Ltd. (Thailand)
Global Tech Design Pte Ltd. (Singapore)
Permasteelisa Ltd. (Taiwan)
Josef Gartner Ltd. (Macau)
Qing Xi Hau Kee
Metal & Engineering
Co Ltd (China)
Josef Gartner & Co. (China)
D**gGuan Permasteelisa
Curtain wall Co. Ltd
(China)
Global Architectural Co. (Thailand)
Global Wall Co. (Thailand)
Permasteelisa Ltd. Architecture Products Co. (Taiwan)
Global Wall Sdn. Bhd. (Malaysia) Co. Ltd (China)
Million Grand Industrial
Ltd (China)
( ) ( y )
PERMASTEELISA IIIIIGARTNER
02group organization – INDIA
02 OPERATIVE STRUCTURE
PERMASTEELISA IIIIIGARTNER
0202India work forceIndia work force
P t St ffi iti I di O ti
02 OPERATIVE STRUCTURE .Present Staffing position India Operations
DepartmentsDepartments --PresentPresent --44thth QTRQTR 20082008
Accounts, HR & Admin -14 -18
Purchase -06 -09
QS -03 -05
Design (India operations) -34 -40g
Design (Over seas/India operations) -21 -22
Factory Operations -24 -31
Project 45 55Project
45
-55
Present Workerposition India OperationsPresent Worker position India Operations
(including in house sub(including in house sub--contractors)contractors)
DepartmentsDepartments --PresentPresent --MidMid 20082008
Factory Operations -110 -125
Project 220 350Project
-350
PERMASTEELISA IIIIIGARTNER
0202India work forceIndia work force
P t St ffi iti I di O ti
02 OPERATIVE STRUCTURE .Present Staffing position India Operations
DepartmentsDepartments --PresentPresent --44thth QTRQTR 20082008
Accounts, HR & Admin -14 -18
Purchase -06 -09
QS -03 -05
Design (India operations) -34 -40g
Design (Over seas/India operations) -21 -22
Factory Operations -24 -31
Project 45 55Project
45
-55
Present Workerposition India OperationsPresent Worker position India Operations
(including in house sub(including in house sub--contractors)contractors)
DepartmentsDepartments --PresentPresent --MidMid 20082008
Factory Operations -110 -125
Project 220 350Project
-350
PERMASTEELISA IIIIIGARTNER
0202IndiaIndia officesoffices
Present Office /Present factory locations & AreasOffice / factory locations & Areas
02 OPERATIVE STRUCTURE
Present Office / factory locations & AreasPresent Office / factory locations & Areas
(Leased / Rented)(Leased / Rented)
OfficeOffice --AreaArea
Bangalore HQ -14500 ft2
Chennai Office (RO) -1500 ft2
Hyderabad (RO) -1200 ft2y ( )
Mumbai (RO) -2000 ft2
Factory (Hosur) 72 Acre landFactory (Hosur) -7.2 Acre land
• Factory Shed (Closed Space) -30,000 ft2
PERMASTEELISA IIIIIGARTNER
0202IndiaIndia officesoffices
Present Office /Present factory locations & AreasOffice / factory locations & Areas
02 OPERATIVE STRUCTURE
Present Office / factory locations & AreasPresent Office / factory locations & Areas
(Leased / Rented)(Leased / Rented)
OfficeOffice --AreaArea
Bangalore HQ -14500 ft2
Chennai Office (RO) -1500 ft2
Hyderabad (RO) -1200 ft2y ( )
Mumbai (RO) -2000 ft2
Factory (Hosur) 72 Acre landFactory (Hosur) -7.2 Acre land
• Factory Shed (Closed Space) -30,000 ft2
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 operative structure .Design Engineering .R&D Innovations & Technology..R&D Innovations & Technology .Manufacturing & Production Processes .QA.AC / Logistic Packing & Delivery .Site & Project Operations
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 design engineering .Over the years, design solutions have
become Permasteelisa’s core asset. .Extensive use of computers advancedExtensive use of computers, advanced
modeling and sophisticated 2D and 3D
software. .Analysis of technical and innovative solutions,
and allows an easier and faster management of
complex and important projects. PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 Research & Development
•
Permasteelisa Groupp acknowledgge higgh technologgical solutions and investment in
new technology to maximize efficiency in the management of resources.
•
Principal centers and head offices in Italy, Germany, Netherlands, USA, Singapore,
China, Hongkong and Thailand provide research laboratories and product test centers
with “State of the art” facilities.
•
These R&D facilities and
activities allow verification of
the curtain wall for structural
adequacy through the use of
sophisticated electronic and
computer equipments. PERMASTEELISA IIIIIGARTNER
02
02 operative structure
02 R&D Thermal 2D and 3D Analysis ...Permasteelisa is able to calculate the u-values of glass, profiles and facade panels02
02 operative structure
02 R&D Thermal 2D and 3D Analysis ...Permasteelisa is able to calculate the u-values of glass, profiles and facade panels
g,p p
for different standards.
•
The simulation tools can determine the temperature distribution in order to detect
material stress and failure.
•
The lateral heat flow for detailed checks of thermal performance of profiles as well
as condensation under various internal and external conditions can also be detected. PERMASTEELISA IIIIIGARTNER
02
02 operative structure
R&D Daylighting Analysis ... Permasteelisa is capable to calculate the daylight availability in the building and allows
predictions on the illuminance levels. . Shading analysis determine the light income and show the glare risk through the window
areas. . Daylighting simulation programs can predict the need of artificial light and the control
VICTORIA STREET
strategies of shading devices and daylighting technologies. . Herewith the energy demand for the overall building perfomance can be determined. OAD
EET
MIDDLE RO
BAIN STRE
NORTH BRIDGE ROAD
PERMASTEELISA IIIII GARTNER
02 operative structure 02 operative structure
02
•
02 Performance Test Lab
pressure and stimulate testing to
any current world standards.
.The test chambers are capable
to test three dimensional facades
upto a maximum of 10kPap
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 Testing Procedures .Watertightness .Wind resistance /..Wind resistance /
Displacement measurement
with a transducer
PERMASTEELISA IIIIIGARTNER
•
Impact / Resistance Test
•
Thermal cycling test
02 operative structure 02 operative structure
02
•
02 manufacturing & production processes .Production plants all over
the world, equipped with the
most modern and advanced
production facilities available pwithin the industry. .Advanced manufacturing systems
such as computerized automatedsuch as computerized automated
conveyor lines for the assembly of
structurally glazed panelized curtain
wall units of large dimension. .The group factories cover an area of
200,000m2 and have an annual
production capacity in excess of
900 000m2 of curtain wall900,000m of curtain wall. PERMASTEELISA IIIIIGARTNER
02
02 operative structure
02INDIA – FACTORY HOSUR
PERMASTEELISA IIIIIGARTNER
02
02 operative structure
02INDIA – FACTORY HOSUR
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
02INDIA FACTORY HOSUR
CNC MULTI OPERATION CAM
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
02INDIA FACTORY HOSUR
CNC MULTI OPERATION CAM
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
02INDIA FACTORY HOSUR
ASSEMBLY SHOP
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
02INDIA FACTORY HOSUR
ASSEMBLY SHOP
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
GLAZING CONVEYOR LINE
PERMASTEELISA IIIIIGARTNER
02INDIA – FACTORY HOSUR
02 operative structure
GLAZING CONVEYOR LINE
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 quality control & quality assurance
executes an internal quality
control using sophisticated test
equipment operated by
qualified technicians which
ti l if th f
Activities
Tendering & Quotation
Tendering & Quotation Department Responsible
Tender/Contracts/Q.S.g Q
Design
Drawing Control
Purchasing
Design
Purchasing
/ /Q
Concept Design/Technical
Production..The Permasteelisa Group
it l lit (Incoming Material &
Production Control)
(Production Verification
Equipment Calibration)
(Production)
(Product Verification)
Human
Resources
(Factory)*
Note -*(Factory details are
for information only)
(Factory)*
Note -*(Factory details are
for information only)
Human Resource
Management
(Warehouse Storage
Product Issue)
Project Management
(Warehouse Control)
Project Control
Resources
Finance/Admin
(Factory)*
Note -*(Factory details are
for information only)
continuouslyverify thestateof
the materials with respect to
the project specifications. Drawing Control
Variation Work
Site Supervision
Material Storage
Site Verification
Equipment Calibration
Installation Verification
Site Supervision
Project/Site
Contracts/Q.S. Project/Site
Project/Site
Maintenance
Maintenance
Project/Site Document &
Record Control
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 quality control & quality assurance
MATERIAL
DELIVERYDELIVERY
CURTAINWALL PANEL
INSTALLATION
JOINT INSPECTION
WITH MAIN CONTRACTOR
INTERNAL QUALITY
INSPECTION
Form: QACWPII
INTERNAL QUALITY
INSPECTION
Form: QAGUTJT
QAFRESF
QAIPSJ
QAIPSJ
INTERNAL QUALITY
INSPECTION
Form: QAIEFCI
OTHER COMPONENTS
INSTALLATION
FINAL CLEANING
Form: CWPII
JOINT INSPECTION
WITH MAIN CONTRACTOR
Form: GUTJT
FRESF
IPSJIPSJ
JOINT INSPECTION
WITH MAIN CONTRACTOR
Form: IEFCI
HANDOVER HANDOVER Form: QAIEFCI Form: IEFCI
PERMASTEELISA IIIIIGARTNER
02 operative structure 02 operative structure
02
•
02 iso certificates
•
Total quality is pursued
through ISO 9001
certification for all
production phases:
starting from the initial
prototype and design
phase, through to testing
of the sample for
performance according to
the specific regulations of
ffthe different countries, on
to the production, packing
and installation phases. PERMASTEELISA IIIIIGARTNER
0202QUALITYQUALITY SYSTEMSYSTEM
02 operative structure
QQ
IN INDIA APARAT FROM THE GROUP SUPPORT SYSTEM WE A GOOD TEAM OF
WELL TRAINED QS PERSONNELS AT FACTORY AND SITE LEVELWELL TRAINED QS PERSONNELS AT FACTORY AND SITE LEVEL. BASED ON OUR PAST EXPERIENCE IN INDIA AND CONTINUAL IMPROVEMENT WE
HAVE STREAMLINED OUR POILCY AND SIGNIFICANT CHANGES WERE MADE
EFFECTIVE,
SINGAPORESINGAPORE QC Networking helps
INDIAINDIA
THAILANDTHAILAND
DONGUANDONGUAN
us to share our day
today QA/QC problems. And effective stringent
system will be
DONGUANDONGUAN
BEIJINGBEIJING
HONGKONGHONGKONG
SYDNEYSYDNEYEXCLUSSIVE ASIA QC
NETWORK
established.. NETWORK
PERMASTEELISA IIIIIGARTNER
0202QUALITYQUALITY SYSTEMSYSTEM
02 operative structure
QQ
IN INDIA APARAT FROM THE GROUP SUPPORT SYSTEM WE A GOOD TEAM OF
WELL TRAINED QS PERSONNELS AT FACTORY AND SITE LEVELWELL TRAINED QS PERSONNELS AT FACTORY AND SITE LEVEL. NETWORK
PERMASTEELISA IIIIIGARTNER
0202QUALQUITY SYSTEMALITY SYSTEM
02 operative structure
QC REVISITED:PERIODICAL
QA/QC AUDIT BY SINGAPORE IN OUR FACTORY.
0202QUALITY SYSTEMQUALITY SYSTEM
ALL REPORTS PERTAINING TO QA/QC WAS CHECKED AND MONITORED ON
WEEKLY BASIS. INVOLVE EDUCATE ALL QC PERSONNELS WHO ARE PART OF OUR TEAM i.E,
ALL OUR MAJOR SUPPLIERS. ALL OUR MAJOR FABRICTORS. PLACEMENT OF OUR QC PERSONNELS AT PROCESSOR FACILITY TOPLACEMENT OF OUR QC PERSONNELS AT PROCESSOR FACILITY TO
ENSURE OUR PRODUCT IS PROCESSED TO STANDARDS. PERMASTEELISA IIIIIGARTNER
0202QUALQUITY SYSTEMALITY SYSTEM
02 operative structure
QC REVISITED:PERIODICAL
QA/QC AUDIT BY SINGAPORE IN OUR FACTORY.
0202QUALITY SYSTEMQUALITY SYSTEM
ALL REPORTS PERTAINING TO QA/QC WAS CHECKED AND MONITORED ON
WEEKLY BASIS. PERMASTEELISA IIIIIGARTNER
03 project gallery
0303 project gallery ...Worldwide ..Pacific ( Asia and Australia)
PERMASTEELISA IIIIIGARTNER
03 project gallery
0303 project gallery ...Worldwide ..Pacific ( Asia and Australia)
PERMASTEELISA IIIIIGARTNER
03 worldwide projects in europe & united states
03 project gallery . The Helicon Finsbury Pavement UKCharlemagne
-Belgium
City Gate -Germany
10 Fleet Place – UK
Corporation of Lloyd’s -UK Sony Center -Germany Messeturm -Germany RWE -Germany
PERMASTEELISA IIIIIGARTNER
03 worldwide projects in europe & united states
03 project gallery . The Helicon Finsbury Pavement UKCharlemagne
-Belgium
City Gate -Germany
10 Fleet Place – UK
Corporation of Lloyd’s -UK Sony Center -Germany Messeturm -Germany RWE -Germany
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 pacific projects in asia & australia .. Bank of China
Hong Kong
Thai Farmers Bank
Thailand
Jin Mao
P.R. China
Capital Tower
Singapore
Jiu Shi
P.R. China
Telecom
Malaysia
Exchange Center
Singapore
2QRC
Hong Kong
United Overseas Bank
Singapore
LG
Korea
Parkview
Singapore
Cosco
P.R. China
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 pacific projects in asia & australia .. China
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 projects with a difference .. The Nationale Nederlanden
Building
(Prague -Czech Republic)
Channel 4 – London
(London – U.K.) The entrance area and the various
A real engineering challenge in its
complex surface definition. Another Frank Gehry creation
cladding systems made this a challenging
projects in regards to the overall
engineering
The Sydney Opera House
(Sydney – Australia)
The first building in the world to
use structural sealant and
suspended glass on a large scale. The Barcelona Fish
(Barcelona – Spain)
Monumental sculpture made from strips
of electro colored stainless steel
The Guggenheim Museum
(Bilbao – Spain)
The Frank Gehry
Masterpiece constructed
from Titanium panels of electro-colored stainless steel. PERMASTEELISA IIIIIGARTNER
03 project gallery 03 projects with a difference .. PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: MAGUS ESTATES
Architect :
Lohan Capreil -CS
FOUR SEASONS -MUMBAI
p
Completion: 2007
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: MAGUS ESTATES
Architect :
Lohan Capreil -CS
FOUR SEASONS -MUMBAI
p
Completion: 2007
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: MICROSOFT
Architect :
RSP Arhitects -Bangalore
MICROSOFT CAMPUS 1 -HYD
Completion: 2008
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: MICROSOFT
Architect :
RSP Arhitects -Bangalore
MICROSOFT CAMPUS 1 -HYD
Completion: 2008
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects
WOCKHARDT-MUMBAI 2000
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects
WOCKHARDT-MUMBAI 2000
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects
ICICI HQ-MUMBAI 1999
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects
ICICI HQ-MUMBAI 1999
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
IBC KNOWLEDGE PARK-2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
IBC KNOWLEDGE PARK-2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
ITPL 1C –BANGALORE -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
ITPL 1C –BANGALORE -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MOTOROLLA –BANGALORE -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MOTOROLLA –BANGALORE -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MICROSOFT-Phase-1 -HYDERABAD -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MICROSOFT-Phase-1 -HYDERABAD -2004
PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MICROSOFT-Phase-2 -HYDERABAD PERMASTEELISA IIIIIGARTNER
03 project gallery
03 INDIA projects03 INDIA projects
MICROSOFT-Phase-2 -HYDERABAD PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects
ITPC -CHENNAI -JUL 2005 PERMASTEELISAIIIIIGARTNER
03 project gallery 03 INDIA projects
ITPC -CHENNAI -JUL 2005 PERMASTEELISAIIIIIGARTNER
03 project gallery 03 INDIA projects03 INDIA projects
OTPC -CHENNAI
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects03 INDIA projects
OTPC -CHENNAI
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects03 INDIA projects
IBC-2 BANGALORE – FEB 2006
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects03 INDIA projects
IBC-2 BANGALORE – FEB 2006
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: KINGSTON PROPERTIES
Architect :HOK -NY
Completion: 2008
OBEROI TOWERS -MUMBAI
Completion: 2008
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: KINGSTON PROPERTIES
Architect :HOK -NY
Completion: 2008
OBEROI TOWERS -MUMBAI
Completion: 2008
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: SHEITH BUILDERS
Architect : P&T -Singapore
Completion: 2008
BEAUMONDE TOWER A,B,C -MUM
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: SHEITH BUILDERS
Architect : P&T -Singapore
Completion: 2008
BEAUMONDE TOWER A,B,C -MUM
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: ASSETZ
Architect : HOK -HKG
Completion: 2008
VRINDAVAN TECH VILLAGE -BGL
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: ASSETZ
Architect : HOK -HKG
Completion: 2008
VRINDAVAN TECH VILLAGE -BGL
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. MICROSOFT P 3 HYDERABAD 2008 COMPLETED
PERMASTEELISA IIIIIGARTNER
MICROSOFT-Phase-3-HYDERABAD – 2008 COMPLETED
03 project gallery 03 INDIA projects.. MICROSOFT P 3 HYDERABAD 2008 COMPLETED
PERMASTEELISA IIIIIGARTNER
MICROSOFT-Phase-3-HYDERABAD – 2008 COMPLETED
03 project gallery 03 INDIA projects.. Client: EMBASSY
Architect : RSP – Architects Bangalore
Completion: 2008
EMBASSY CORPORATE -BGL
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: EMBASSY
Architect : RSP – Architects Bangalore
Completion: 2008
EMBASSY CORPORATE -BGL
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: APEEJAY SURRENDRA GROUP
Architect : SOM – NY. Completion: 2009
THE PARK -HYD
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Completion: 2009
THE PARK -HYD
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: ICICI
Architect : HAFEEZ CONTRACTOR
Completion: 2009
ICICI COMPLEX -HYD
ICICI COMPLEX – HYD – Podium Block only
PERMASTEELISA IIIIIGARTNER
03 project gallery 03 INDIA projects.. Client: ICICI
Architect : HAFEEZ CONTRACTOR
Completion: 2009
ICICI COMPLEX -HYD
ICICI COMPLEX – HYD – Podium Block only
PERMASTEELISA IIIIIGARTNER
SPECIALSPECIAL
JOBS WORLDJOBS WORLD
WIDEWIDE
52PERMASTEELISA IIIIIGARTNER
SPECIALSPECIAL
JOBS WORLDJOBS WORLD
WIDEWIDE
52PERMASTEELISA IIIIIGARTNER
Walt Disney Concert Hall
Walt Disney Concert Hall
Los Angeles, USA
Structure The exterior of the Concert Hall is
clad in stainless steel panels. The
building’s orientation, combined
with the curving and folding exterior
walls present highly sculptural
compositionscompositions. Architect: Frank O. Gehry & Associates
Engineers: John A. Martin & Associates
Developer: Walt Disney Concert Hall 1
Contractor: M.A. Mortenson
Surface: 15.000 m² Stainless steel panels
4 000 ² Gl i4.000 m² Glazing
PERMASTEELISA IIIIIGARTNER
Walt Disney Concert Hall
Walt Disney Concert Hall
Los Angeles, USA
Structure The exterior of the Concert Hall is
clad in stainless steel panels. Mortenson
Surface: 15.000 m² Stainless steel panels
4 000 ² Gl i4.000 m² Glazing
PERMASTEELISA IIIIIGARTNER
Experience Music Project
Experience Music Project,
Seattle (USA)
Structure Steel and glass structure on the
roof
Ahit t F k O G h & A i tArchitect: Frank O.Gehry & Associates,
Inc. Client: Skilling Ward Magnusson
Barkshire Inc. Developer: Paul Allen
Contractor: Hoffman Construction
PERMASTEELISA IIIIIGARTNER
Experience Music Project
Experience Music Project,
Seattle (USA)
Structure Steel and glass structure on the
roof
Ahit t F k O G h & A i tArchitect: Frank O.Gehry & Associates,
Inc. Developer: Paul Allen
Contractor: Hoffman Construction
PERMASTEELISA IIIIIGARTNER
Guggenheim Museum
G h i MGuggenheim Museum
Bilbao, Spain
Structure The skin is made of titanium. It’s
characteristics of high strength and
lti it id ti l lelasticity provide a particularly
aesthetic and desired effect of
dynamic wrinkling of the building
envelope under the action of wind. Architect: Frank O.Gehry & Associates, Architect: Frank O.Gehry & Associates,
Inc./ Arch. C.Caicoya,
Arch. A. Amann, C.A. Azcarate
Contractor: Balzola
Surface: 36.000 m² of pure titanium cladding
PERMASTEELISA IIIIIGARTNER
Guggenheim Museum
G h i MGuggenheim Museum
Bilbao, Spain
Structure The skin is made of titanium. Azcarate
Contractor: Balzola
Surface: 36.000 m² of pure titanium cladding
PERMASTEELISA IIIIIGARTNER
Guggenheim MuseumGuggenheim Museum
PERMASTEELISA IIIIIGARTNER
Guggenheim MuseumGuggenheim Museum
PERMASTEELISA IIIIIGARTNER
DrugstoreDrugstore PublicisPublicis, Pa, Prisaris
DRUGSTORE PUBLICIS, PARISDRUGSTORE PUBLICIS, PARIS
Client SNC Drugstore Champs
Elysées, Paris France
Architect Building Inc., Los Angeles
Structure stainless steel fins,
glass bead blasted
Surface 710 m²
Completion 2004
PERMASTEELISA IIIIIGARTNER
DrugstoreDrugstore PublicisPublicis, Pa, Prisaris
DRUGSTORE PUBLICIS, PARISDRUGSTORE PUBLICIS, PARIS
Client SNC Drugstore Champs
Elysées, Paris France
Architect Building Inc., Los Angeles
Structure stainless steel fins,
glass bead blasted
Surface 710 m²
Completion 2004
PERMASTEELISA IIIIIGARTNER
DrugstoreDrugstore PublicisPublicis, Pa, Prisaris
58PERMASTEELISA IIIIIGARTNER
DrugstoreDrugstore PublicisPublicis, Pa, Prisaris
58PERMASTEELISA IIIIIGARTNER
BMW WELTBMW WELT
BMW World, Munich
Client Bayerische Motoren Werke AG
Ahit t COOP Hi lb(l)Architect COOP Himmelb(l)au,
Rix & Swiczinski GmbH, Vienna
Structure Heated façade, double cone
Surface 40.000 m²
Completion 2007
PERMASTEELISA IIIIIGARTNER
BMW WELTBMW WELT
BMW World, Munich
Client Bayerische Motoren Werke AG
Ahit t COOP Hi lb(l)Architect COOP Himmelb(l)au,
Rix & Swiczinski GmbH, Vienna
Structure Heated façade, double cone
Surface 40.000 m²
Completion 2007
PERMASTEELISA IIIIIGARTNER
U S INTERACTIVEU S INTERACTIVEU. S. INTERACTIVEU. INTERACTIVE
Client: US Interactive
Architect GehryArchitect
:
Gehry
Structure
:
Glazed (Clad
form glass)
unitized panels
Surface: 10,000l.m. Completi 2005
on:
60PERMASTEELISA IIIIIGARTNER
U S INTERACTIVEU S INTERACTIVEU. Completi 2005
on:
60PERMASTEELISA IIIIIGARTNER
Dream Mall, TaiwanDream Mall, Taiwan
Client Tung LiSurface 65,000 m2Completion 2006
61 PERMASTEELISA IIIIIGARTNER
Dream Mall, TaiwanDream Mall, Taiwan
Client Tung LiSurface 65,000 m2Completion 2006
61 PERMASTEELISA IIIIIGARTNER
Novartis, BaselNovartis, Basel
Novartis, Basel
Client Arcoplan Nissen & WentzlaffClient Arcoplan Nissen & Wentzlaff
Architect Frank O’Gehry
Surface 9000 m2
Completion 2008
PERMASTEELISA IIIIIGARTNER
Novartis, BaselNovartis, Basel
Novartis, Basel
Client Arcoplan Nissen & WentzlaffClient Arcoplan Nissen & Wentzlaff
Architect Frank O’Gehry
Surface 9000 m2
Completion 2008
PERMASTEELISA IIIIIGARTNER
Mercedes Benz Museum,Mercedes Benz Museum,Mercedes Benz Museum,Mercedes Benz Museum,
Stuttgart -Untertürkheim
Structure Steel-glass stick system 6.840 m²,
welded T-Profiles made of steel and various
special profiles with screwed aluminium
pressure beads. The complex geometry
requires approx. 1700 different glass sizes. Glass with silkscreen, drop protection and
overhead glazing. Architect: UN-Studio von Berkel+Bos,
Amsterdam, NL
Site-Wenzel+Wenzel, Dipl.-Ing.,
Management:Freie Architekten, Karlsruheg ,
Owner: DCI Daimler Chrysler,
Immobilien,Berlin
Surface: 18.000 m²
6.840 m² Steel-glass stick system
532 m² Steel-glass roof,
2.700 m² grilles for roof,
7.250 m² sheet glazing,
650 m² louvre technique
Completion: 2005
PERMASTEELISA IIIIIGARTNER
Mercedes Benz Museum,Mercedes Benz Museum,Mercedes Benz Museum,Mercedes Benz Museum,
Stuttgart -Untertürkheim
Structure Steel-glass stick system 6.840 m²,
welded T-Profiles made of steel and various
special profiles with screwed aluminium
pressure beads. Architect: UN-Studio von Berkel+Bos,
Amsterdam, NL
Site-Wenzel+Wenzel, Dipl.-Ing.,
Management:Freie Architekten, Karlsruheg ,
Owner: DCI Daimler Chrysler,
Immobilien,Berlin
Surface: 18.000 m²
6.840 m² Steel-glass stick system
532 m² Steel-glass roof,
2.700 m² grilles for roof,
7.250 m² sheet glazing,
650 m² louvre technique
Completion: 2005
PERMASTEELISA IIIIIGARTNER
Address
Website
Alerts
Be the first to know and let us send you an email when Parmasteelisa posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.
Shortcuts
- Address
- Alerts
- Claim ownership or report listing
-
Want your business to be the top-listed Travel Agency?