Miss Margaritaville

  • Home
  • Miss Margaritaville

Miss Margaritaville Miss Margaritaville is a Fantastic Vacation Destination home on Hwy 30-A in Seacrest Beach, Florida. VRBO No. 642580 http://www.vrbo.com/642580

Miss Margaritaville is a classic Florida Beach Cottage only steps away from the Beach on beautiful Hwy 30A in Seacrest Beach, FL. The house is 3 levels with 4 bedrooms, 3 bathrooms, 2 kitchens, private pool and huge decks. The house is built for large families or multi-family vacations. Rosemary Beach, Seacrest Beach, Alys Beach, Seagrove Beach, and Seaside are a short bike ride way. The house is less that 30 Minutes from Panama City Beach Airport (ECP). www.vrbo.com Search 642580

Introducing Miss Margaritaville 2.0.After a monumental renovation, Miss M is more enjoyable, relaxing, and memorable tha...
10/07/2020

Introducing Miss Margaritaville 2.0.
After a monumental renovation, Miss M is more enjoyable, relaxing, and memorable than ever before.

Sleeps 16 with 2 bunk rooms, 3
Master bedrooms, private heated pool, enormous outdoor living space and outdoor kitchen, and a short walk to the sugar white sandy beach!

Just opened in July for rentals there are still a few weeks open in the calendar to schedule your much needed trip to the beach in 2020!

Click the link below by booking direct to save the VRBO Booking fee!

https://www.30a-vacay.com/property/seacrest-miss-margaritaville

Seacrest, Seacrest West, Miss Margaritavilla, Margarita, 30A Homes, Rental Homes, 30A, Vacation Rentals, 30A Vacay, Miss Marg

Outdoor Landscape Lighting Is finished! Adding 2 more palms and oleanders on Monday!!Our first guests since the renovati...
27/06/2020

Outdoor Landscape Lighting Is finished! Adding 2 more palms and oleanders on Monday!!

Our first guests since the renovation will arrive in a few hours. We hope they love the new Miss Margaitaville!!

Our first guests will arrive Saturday since our ambitious remodel that began in November of last year. We are very excit...
24/06/2020

Our first guests will arrive Saturday since our ambitious remodel that began in November of last year. We are very excited to share the new, but still quirky, Miss M. with each person that beckons our door. Guys, I didn’t think we would make it this far. It’s been one hard turn after another and many tears. I pray each of you will love it, for it’s been a real labor of love... So come. Love it. Beach it. Relax, and “Miss Margaritaville it!” See you soon...

A week of push to get close to opening up for rentals at the end of the month. Still lots of details but coming together...
06/06/2020

A week of push to get close to opening up for rentals at the end of the month. Still lots of details but coming together.. Great to have this outdoor living space for Big gatherings!!

Beam covers installed in living room
16/05/2020

Beam covers installed in living room

Miss M now has Laundry on both 1st and 2nd floor.
16/05/2020

Miss M now has Laundry on both 1st and 2nd floor.

Third floor bunk room is finished. Has 2 twin over full bunks.
16/05/2020

Third floor bunk room is finished. Has 2 twin over full bunks.

Outdoor living space getting close
09/05/2020

Outdoor living space getting close

Building bunks on first floor
09/05/2020

Building bunks on first floor

09/05/2020

What can I say??

07/05/2020

Don’t see any virus out there today! Maybe will go take a closer look!

Making Progress on the Trex Deck.
08/03/2020

Making Progress on the Trex Deck.

Outdoor Living in Progress
08/03/2020

Outdoor Living in Progress

First floor Bath is nearly complete... but needs to be repainted to Sea Salt. We can then finish installation of the fix...
07/03/2020

First floor Bath is nearly complete... but needs to be repainted to Sea Salt. We can then finish installation of the fixtures.

Say hello to the new 1st floor bunk room. This bunk room will have 4 bunks and 2 50" TVs for ultimate gaming at the beac...
06/03/2020

Say hello to the new 1st floor bunk room. This bunk room will have 4 bunks and 2 50" TVs for ultimate gaming at the beach!

First Floor Bedroom is complete! Need a little cleaning and ready to setup the new King Bed!
05/03/2020

First Floor Bedroom is complete! Need a little cleaning and ready to setup the new King Bed!

Nearly complete with First Floor. Only have a little trim and some doors to install. This is the new first floor laundry...
05/03/2020

Nearly complete with First Floor. Only have a little trim and some doors to install. This is the new first floor laundry area near the exit to the pool.

Miss Margaritaville 2.0Yay!! A New Trex Deck is on the way!!So I enjoy being at the beach as much as the next guy and gi...
08/02/2020

Miss Margaritaville 2.0

Yay!! A New Trex Deck is on the way!!

So I enjoy being at the beach as much as the next guy and given a choice I would rather work in the sunshine on 30A. However, I will not miss painting the deck.. I can find something else to do!

Demo is in process!

31/01/2020

Miss Margaritaville 2.0 Endless Hot Water

When we removed the outside laundry which also housed our water heater, we decided to install a gas tankless hot water heater with a recirculation loop. All of the plumbing is roughed in and ready to be mounted. We're on the schedule for the utility company to extend the gas line sometime this month. Soo.. endless hot water coming soon!

28/01/2020

Miss Margaritaville 2.0 HVAC System Upgrade

When we added the 2nd level laundry we have to eliminate the HVAC supply to the 3rd level. This enabled us to install a dedicated 3rd floor HVAC system to keep it cool in those summer months without freezing those on the first floor!

The supply lines were installed this week and should be up and running soon!

Miss Margaritaville 2.0 Second Floor update♦︎ Tile is finished in the Walk-in Shower.Really it is not as small as it loo...
25/01/2020

Miss Margaritaville 2.0 Second Floor update

♦︎ Tile is finished in the Walk-in Shower.

Really it is not as small as it looks. Its the same size as the existing tub with a shower head and hand wand as well.

Miss Margaritaville 2.0 Third FloorSome of the planned changes include:♦︎ Enlarged bathroom♦︎ Larger Vanity♦︎ New Tub / ...
21/01/2020

Miss Margaritaville 2.0 Third Floor

Some of the planned changes include:
♦︎ Enlarged bathroom
♦︎ Larger Vanity
♦︎ New Tub / Shower
♦︎ Ensuite access to the bath from the master bedroom
♦︎ Shelving for towels and supplies

Miss Margaritaville 2.0 Progress UpdateTile is installed in the new first floor bathroom
19/01/2020

Miss Margaritaville 2.0 Progress Update

Tile is installed in the new first floor bathroom

Miss Margaritaville 2.0We're finally getting a new roof. Once finished it will extend over the new outdoor living space.
18/01/2020

Miss Margaritaville 2.0

We're finally getting a new roof. Once finished it will extend over the new outdoor living space.

Miss Margaritaville 2.0 Outdoor Living AreaWe wanted to make the back yard and pool area much more enjoyable and connect...
17/01/2020

Miss Margaritaville 2.0 Outdoor Living Area

We wanted to make the back yard and pool area much more enjoyable and connected to the rest of the house. With the addition of this outdoor living space there will be extra room for meal prep and just hanging out enjoying outdoor with all the comforts of the living room!

Miss Margaritaville 2.0 Second FloorSome of the planned changes include:♦︎ Renovated Bathroom with Walk-in shower♦︎ Acce...
16/01/2020

Miss Margaritaville 2.0 Second Floor

Some of the planned changes include:
♦︎ Renovated Bathroom with Walk-in shower
♦︎ Access from the Bedroom to the Bath to create Ensuite Bath
♦︎ Full Size Washer / Dryer in the bath hallway area
♦︎ Closing the window looking onto the deck (and into the Bedroom) and adding 2 West facing windows.
♦︎ New Door from the kitchen opening out and not into the fridge.

Miss Margaritaville 2.0 Traffic ManagementWith all of the changes going on at Miss M, we decided to change the flow of t...
12/01/2020

Miss Margaritaville 2.0 Traffic Management

With all of the changes going on at Miss M, we decided to change the flow of things a bit. The stairs to the 2nd level deck on the front of the house will be on the left. This will give us more parking space. Also the shower is moved to the side of the house with (HOT and COLD) water.. for hosing off when coming back from the beach! This side entrance will make it easier to go straight back to the pool or the first floor.

Miss Margaritaville 2.0 First Floor ChangesWe wanted to rework the first level and make the space more inviting, usable ...
12/01/2020

Miss Margaritaville 2.0 First Floor Changes

We wanted to rework the first level and make the space more inviting, usable and accessible. Some of the planned changes to come are:
♦︎ Inside Laundry
♦︎ Larger Bathroom with a Tub
♦︎ Removal of the kitchen with direct access to the patio
♦︎ Moving of the entry door out of the bedroom to the west side of the house.
♦︎ Moving the access to the garage from the bedroom to the hallway.
♦︎ Additional windows

Miss Margaritaville 2.0Started the renovation with some structural and subfloor issues. We discovered that the settling ...
11/01/2020

Miss Margaritaville 2.0

Started the renovation with some structural and subfloor issues. We discovered that the settling near the front door needed some house-jacking, the addition of some floor joists, blocking and new subfloor. The flooring in the last 2 pics is the flooring that will be through the entire house once finished. Yes.. we had to say goodby to the cracked white tile and carpet.

Address


Alerts

Be the first to know and let us send you an email when Miss Margaritaville posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Shortcuts

  • Address
  • Alerts
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share