Crowm Limited Civil engineer by background with over 30 years experience in Civil Engineering and Construction.
(42)

05/12/2024

Bit of a change from our usual xmas competition. This year if you give us a mention and a share and give us a charity of your choice . We will enter you into a raffle draw. The winners charity choice will receive 100 pounds from Crowm Limited . Winner will be drawn on christmas eve. The order you share our page will be your number . One entry per share

Now the weather has warmed up a bit weve returned to this one.  Handrail to stairs is in. Pizza oven has been  put toget...
05/12/2024

Now the weather has warmed up a bit weve returned to this one. Handrail to stairs is in. Pizza oven has been put together ready brickwork face and rendering, shelving for cooking area is in and tiling is grouted. We have saved all tanalised off cuts for an outside fire pit and white wood offcuts for the pizza stove. No wood wasted

New wrap around composite decking installed on new timber strucure. New timber to front to be stained to match existing....
03/12/2024

New wrap around composite decking installed on new timber strucure. New timber to front to be stained to match existing. Originally we had discussed with the client that there was a possibility that we would need to replace the existing structure as we could not determine from above , but it had only been done 5yrs ago. Unfortunately the way it had been built and the rot we found meant we had to replace. We did manage to do within the same labour cost though with some hard graft

What a horrible day. One of the jobs today was to replace a floor on a summerhouse that was in otherwise good condition....
02/12/2024

What a horrible day. One of the jobs today was to replace a floor on a summerhouse that was in otherwise good condition. Didnt want the new floor getting wet. So jacked up the structure, built new floor below in the dry and then lowered summerhouse onto newly levelled floor and fixed. Put composite strips below new floor to improve lifespan too. Saving new roof work till tomorrow when its hopefully drier.
Almost finished the new composite deck and wall strengthening on this one. Few extra bits to do as requested

Almost there. Been a slog. Dog compound done.bin store done. Drainage issues done. Electric cable routes for lighting et...
09/11/2024

Almost there. Been a slog. Dog compound done.bin store done. Drainage issues done. Electric cable routes for lighting etc done. Composite cladding 90% . More paving for another area next week and finally get to tile outside kitchen

30/10/2024

We are now moving away from other works and concentrating our efforts on fencing and landscaping . We will complete any promised projects , but will not take any further indoor works on. Thankyou for your continued support.

More progress on the llandudno  job. First paving area complete. Start excavating for next area tomorrow
16/10/2024

More progress on the llandudno job. First paving area complete. Start excavating for next area tomorrow

Built this summerhouse on my own this week.insulated floors and roof. 5 x3m log cabin with a log bar.Had to stain and pr...
12/10/2024

Built this summerhouse on my own this week.insulated floors and roof. 5 x3m log cabin with a log bar.Had to stain and protect outside as it was built ( but even the client helped with the staining), which wasn't fun with the weather we've had this week. Start the planters and paving next week

Sometimes  you have to take one on the chin and work for the family, but at least they worked with me . Composite deck d...
05/10/2024

Sometimes you have to take one on the chin and work for the family, but at least they worked with me . Composite deck done mostly by my son and his partner with a little assistance. Composite deck in a day, over a garage roof

Outside kitchen is coming on well.We poured the Concrete worktop today. On with the summerhouse next week Still more com...
04/10/2024

Outside kitchen is coming on well.We poured the Concrete worktop today. On with the summerhouse next week
Still more composite cladding to do before we start the paving and raised beds

Low maintenance  fencing job done today
18/09/2024

Low maintenance fencing job done today

From a disused brick garage with no roof to a workshop and woodstore. Composite cladding outershell for a clean , low ma...
17/09/2024

From a disused brick garage with no roof to a workshop and woodstore. Composite cladding outershell for a clean , low maintenance structure. Fencing tomorrow prior to a large job in llandudno for previous clients.
Ps the water on the back corner on the photo is from me throwing it into the gutter and missing. Not these gutter leaking

Progressing nicely. Facias and guttering to go on next week and new bell bead above new roof on existing  wall. Bit diff...
13/09/2024

Progressing nicely. Facias and guttering to go on next week and new bell bead above new roof on existing wall. Bit different from the old brick garage when we started

Didn't really get any before photos on this one apart from when small higher level slabs were removed. Massive paved are...
10/09/2024

Didn't really get any before photos on this one apart from when small higher level slabs were removed. Massive paved area extension now complete.turfing done today in the lovely British weather

Big old paved area being made into a whopping big paved area. Not fun coming off previously  laid paving joints but we a...
05/09/2024

Big old paved area being made into a whopping big paved area. Not fun coming off previously laid paving joints but we are making it work

27/08/2024

Evening, hope you are all well, we are no longer taking on work for this year. If you'd like any work carrying out for next year please get in touch. We are running behind currently due to additional works on past jobs. Thanks from us for your continued support.

Just waiting for pointing to cure before we put the wet look sealant over this front garden and the one at the rear we d...
22/08/2024

Just waiting for pointing to cure before we put the wet look sealant over this front garden and the one at the rear we did at the back end of the week. Will really make the colours pop out

Address


Opening Hours

Monday 08:00 - 18:00
Tuesday 08:00 - 18:00
Wednesday 08:00 - 18:00
Thursday 08:00 - 18:00
Friday 08:00 - 18:00

Website

Alerts

Be the first to know and let us send you an email when Crowm Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Crowm Limited:

Videos

Shortcuts

  • Address
  • Opening Hours
  • Alerts
  • Contact The Business
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share