Precast Concrete Engineering & Construction

  • Home
  • Precast Concrete Engineering & Construction

Precast Concrete Engineering & Construction The main goal of this page are giving you a knowledge and experience in Pre-cast concrete Engineering Construction.

Could Any body  help him ?
20/06/2022

Could Any body help him ?

27/10/2021
Sandwich wall installation.
27/06/2021

Sandwich wall installation.

Most important works in precast  are line marking works
26/06/2020

Most important works in precast are line marking works

Parapet  fixing method U SHAPE steel bar with two straight bars Thick welded plate
26/06/2020

Parapet fixing method
U SHAPE steel bar with two straight bars
Thick welded plate

Good evening  If anybody  has it ..Plz direct  contact with him
17/06/2020

Good evening
If anybody has it ..
Plz direct contact with him

Plumb BobA plumb bob is a pointed weight attached to the end of the string, and is used to find a vertical reference lin...
28/02/2020

Plumb Bob

A plumb bob is a pointed weight attached to the end of the string, and is used to find a vertical reference line called plumb. Plumb is the vertical equivalent to a spirit level. Plumb bob have been around for thousands of years, dating back to Ancient Egypt. The tool is also used in surveying, allowing the user to find nadir (the local vertical direction pointing towards gravity), and in tools such as steel tape and theodolites.

As an interesting side note, the English word ‘aplomb’ is derived from the French aplombdenoting the concept of standing upright.

How to Use A Plumb BobMeasure two to three few inches away from the top of the wall, and make a mark.Set a nail in the mark.Hang the plumb bob on the nail, letting gravity draw a vertical reference line for you.When the plumb bob is done oscillating, measure the distance from the wall. If it matches the measurement at the top of the wall, your wall is plumb.

Location  and dimensions  are very important  in precast works ...
28/02/2020

Location and dimensions are very important in precast works ...

Support installation for vertical items should be in an angle between ( 45  to 60) degree to keep the forces in X direct...
28/02/2020

Support installation for vertical items should be in an angle between ( 45 to 60) degree to keep the forces in X direction almost equal or near to Y direction forces ....

Depending on the load bearing structure, precast systems can be divided into the following categories:
06/03/2019

Depending on the load bearing structure, precast systems can be divided into the following categories:

Pre-cast paneled buildings were first established in Liverpool, England, in 1905. A process wasinvented by city engineer...
25/09/2018

Pre-cast paneled buildings were first established in Liverpool, England, in 1905. A process was
invented by city engineer John Alexander Brodie, due to the needing for medium cost efficient
quality and quick construction buildings and through years it was adopted all over the world,
particularly in Eastern Europe and Scandinavia

It used by Mass Company in Iraq
17/09/2018

It used by Mass Company in Iraq

Address


Website

Alerts

Be the first to know and let us send you an email when Precast Concrete Engineering & Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

  • Address
  • Alerts
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share