Thomas construction Only a little business in the warrington,cheshire area qualified joiner and a lot of experience in the building trade we cover all aspect of joiner .

14/11/2023

Nice bit of first fix joinery 🔨

Just a few little job as the customer didn't want to renew garden so abit of rejoining abit of brick work and a soak awa...
11/11/2023

Just a few little job as the customer didn't want to renew garden so abit of rejoining abit of brick work and a soak away system

Catnit lintel Fitted and bricked around and stud work started to separate For 2 bedrooms, ready for First fix electrics ...
09/11/2023

Catnit lintel Fitted and bricked around and stud work started to separate For 2 bedrooms, ready for First fix electrics 😁

27/10/2023

Edgeings fitted for a driveway company in Warrington

24/10/2023
77 flags laid in 5 hours today  has been a good day 😜
22/10/2023

77 flags laid in 5 hours today has been a good day 😜

Lift and re-lay all taken up ,doug out ,aco drains in and crush and run all ready for the re- lay next week 😀 thanks to ...
14/10/2023

Lift and re-lay all taken up ,doug out ,aco drains in and crush and run all ready for the re- lay next week 😀 thanks to Fastcrete for the stone and sand 👍

Lift and relay Job was going well until the rain stopped us 👊🤛
30/09/2023

Lift and relay Job was going well until the rain stopped us 👊🤛

Porcaline and some sleeper nice start on the job 👌
29/09/2023

Porcaline and some sleeper nice start on the job 👌

Lift and relay Job started for a family member ,the levels was awful and the garden was full of bamboo so we have concre...
24/09/2023

Lift and relay Job started for a family member ,the levels was awful and the garden was full of bamboo so we have concreted all the areas it was coming through from neigbours and a good start on laying setting new levels 👍

Brickwork cut out and window fitted on a garage in Horwich
21/09/2023

Brickwork cut out and window fitted on a garage in Horwich

Bit of a late finish but job completed for the customer
20/09/2023

Bit of a late finish but job completed for the customer

Aliminium studwork for walk in wardrobe  or small bedroom
19/09/2023

Aliminium studwork for walk in wardrobe or small bedroom

Start to finish added a new step for customer 👍
18/09/2023

Start to finish added a new step for customer 👍

Driveway completed ✅️600x600 pressed concrete flags .
13/09/2023

Driveway completed ✅️
600x600 pressed concrete flags .

Back once again for the tyrolean master 🤘sand and cement base coat and then finish coat .
04/09/2023

Back once again for the tyrolean master 🤘sand and cement base coat and then finish coat .

5 ton of mot speed and wacked ready to be flagged .
27/08/2023

5 ton of mot speed and wacked ready to be flagged .

Glazed the sliding doors yesterday.
26/08/2023

Glazed the sliding doors yesterday.

Driveway dug out ready to stoned up late one after work
24/08/2023

Driveway dug out ready to stoned up late one after work

Oak ,Oak, Oak, everything Oak  looking good all bespoke joinery off Thomas construction
23/08/2023

Oak ,Oak, Oak, everything Oak looking good all bespoke joinery off Thomas construction

2 fixed sash,s  2 sliding shashes  fitted just waiting on delivery off glass
23/08/2023

2 fixed sash,s 2 sliding shashes fitted just waiting on delivery off glass

Sliding aliminium doors gone in today on the exstention in knustford
22/08/2023

Sliding aliminium doors gone in today on the exstention in knustford

Nice bit of joinery in warrington ✅
03/08/2023

Nice bit of joinery in warrington ✅

Upvc white back door fitted✅
27/07/2023

Upvc white back door fitted✅

Job completed ✅3x2 flags laid1 secton of fecing & tg gate all finish off with pea gravel soakaway
24/07/2023

Job completed ✅
3x2 flags laid
1 secton of fecing & tg gate all finish off with pea gravel soakaway

Old school Tyrolean done in knustford 👍1st coat scratch coat second coat 2nd coat is top coat then a Tyrolean finish coa...
30/06/2023

Old school Tyrolean done in knustford 👍
1st coat scratch coat second coat 2nd coat is top coat then a Tyrolean finish coat to match the house ✅

09/03/2023

Retaining walls sand & cement rendering with black die 1st coat scratch coat second finish coat

09/03/2023

Fitted oak floor and all the disabled wet room all finished ,hade made cupboards, done this to customer preference

Solid oak door fitted onto sliding rail to allow more space in both rooms
09/03/2023

Solid oak door fitted onto sliding rail to allow more space in both rooms

14/02/2023

Kandla grey idian stone completed within a few days

Address


Website

Alerts

Be the first to know and let us send you an email when Thomas construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Shortcuts

  • Address
  • Alerts
  • Videos
  • Claim ownership or report listing
  • Want your business to be the top-listed Travel Agency?

Share