Kas di Kunuku - Bonaire Under construction - Our luxurious villa at Santa Barbara Crowns Terrace, ready mid 2024

What a progression has been made since our last visit, two months ago: the transformation from construction site into (a...
05/04/2024

What a progression has been made since our last visit, two months ago: the transformation from construction site into (almost) our furnished home…

Christmas holidays are over, now at full speed to the finish! 💪🏼 Happy new year!
13/01/2024

Christmas holidays are over, now at full speed to the finish! 💪🏼 Happy new year!

Further and further…
22/11/2023

Further and further…

From the top back downwards… progression ongoing! 💪🏼
03/09/2023

From the top back downwards… progression ongoing! 💪🏼

We reached the highest point! It took roughly three months to build up the upper floor walls, ring bars and the basic ro...
25/06/2023

We reached the highest point! It took roughly three months to build up the upper floor walls, ring bars and the basic roof construction. Now the highest point has been touched, the white “flag” could be raised, not without Amstel Bright and chicken, of course…

26/04/2023
Next level! Groundwork, foundation, installation work… all done, and earlier this week, the main floor concrete has been...
15/03/2023

Next level! Groundwork, foundation, installation work… all done, and earlier this week, the main floor concrete has been poured. The shapes of ‘Kas di Kunuku’ become more and more visible.

The structural work on the lower floor has been finished and the construction workers have started measuring out the fou...
27/11/2022

The structural work on the lower floor has been finished and the construction workers have started measuring out the foundation of the upper. Good work done so far, in spite of the hot sun and lots of rain… So excited that we can walk through our house now!

Good work in progress on the lower floor…
28/09/2022

Good work in progress on the lower floor…

Almost done with the ground works for the lower floor…
25/05/2022

Almost done with the ground works for the lower floor…

Those with a well developed imagination will recognize the start of the pool construction… 😊
23/02/2022

Those with a well developed imagination will recognize the start of the pool construction… 😊

12/12/2021
Native trees on our plot, some around 100 years old, will survive and continue to exist in our future garden: Divi Divi,...
04/07/2021

Native trees on our plot, some around 100 years old, will survive and continue to exist in our future garden: Divi Divi, Palusia, Brasil, Kalebas, Cactus and Agave.

We can’t wait to start up the construction work…
04/07/2021

We can’t wait to start up the construction work…

Adres

31, Terrace, Santa Barbara Crowns
Kralendijk

Telefoon

+31653868853

Website

Meldingen

Wees de eerste die het weet en laat ons u een e-mail sturen wanneer Kas di Kunuku - Bonaire nieuws en promoties plaatst. Uw e-mailadres wordt niet voor andere doeleinden gebruikt en u kunt zich op elk gewenst moment afmelden.

Contact

Stuur een bericht naar Kas di Kunuku - Bonaire:

Delen


Andere Vakantiehuizenverhuur in Kralendijk

Alles Zien