This is Botswana

This is Botswana Explore the hidden treasures of this vast country. From its deserts in the South and Central parts of Botswana, to the wetlands of the Okavango delta

Latest Botswana dam levels courtesy of Water Utilities Corporation
19/02/2024

Latest Botswana dam levels courtesy of Water Utilities Corporation

A breathtaking aerial view of nature's masterpiece in Botswana!
17/02/2024

A breathtaking aerial view of nature's masterpiece in Botswana!

17/02/2024

Witnessed the timeless charm of rural life: a man gracefully guiding his donkey wagon through the streets of Maun (Airport Road) with his faithful dog by his side.

This stretch here 10km south of Maun is the only remaining significant water source in the entire Thamalakane river syst...
10/02/2024

This stretch here 10km south of Maun is the only remaining significant water source in the entire Thamalakane river system.

Most parts of the Boro, Thamalakane and Boteti river channels are drying up and are expected to have little or no water by winter.

Latest dam levels
23/10/2023

Latest dam levels

Recognise this bridge crossing?
23/09/2022

Recognise this bridge crossing?

The BTV circle is still under construction to become a flyover. The contractor expects to hand over the project sometime...
23/07/2022

The BTV circle is still under construction to become a flyover. The contractor expects to hand over the project sometime in October 2022.

18/06/2022

A transformation is underway at Thamalakane river as the annual Okavango Delta water inflow feeds the Boro channel.

Maun is expected to see a rapid rise in water levels as both gomoti and boro river rave towards Boteti river.

View of the construction site of the Palapye Sport Complex.The complex is located on the right hand side, some 3km from ...
17/06/2022

View of the construction site of the Palapye Sport Complex.

The complex is located on the right hand side, some 3km from the Palapye/Gabs/Francistown T junction on the Palapye-Serowe Road.

The sport complex is 100% sponsored by Morupule Coal Mine at a cost of P25 million. The expected completion date is end of 3rd Quarter 2022.

Address

Gaborone

Telephone

+26772305555

Website

Alerts

Be the first to know and let us send you an email when This is Botswana posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Share