CCP Engineering Inc.

CCP Engineering Inc. Professional engineering consulting firm specializing in safety engineering. Fire code, electrical c Press Control Design (Mechanical - Hydraulic).

FULL LIST OF SERVICES FOR CCP ENGINEERING INC. – REV OCT.24, 2013
Contact Nino Balbaa for more information: [email protected], 647-469-6466

Industrial Safety

Fire Safety:
Area classifications of flammable and/or combustible liquids, vapours and dusts for Electrical Code compliance using NFPA, FM Global and other standards. Fire Code audits against National and Provincial Fire Codes, NFPA Standard

s such as NFPA 101, applicable sections of Provincial Building Codes, and best practices. Fire Safety Plans (facility, equipment or operation specific). Design and construction management for Flammable Storage & Dispensing facilities and other rooms requiring special provisions (eg. compressed flammable gas, laboratories, aerosol filling, etc.) Pre-Start Health & Safety Review for Flammable Liquid Storage & Dispensing applications (trigger 1 of the Table in S.7 of Ontario Regulation 851)
Pre-Start Health & Safety Review for any 'Process That Involves The Risk Of Ignition Or Explosion' (trigger 4 of the Table in S.7 of Ontario Regulation 851)
Pre-Start Health & Safety Review for Dust Collectors (trigger 5 of the Table in S.7 of Ontario Regulation 851)
Design of Dust Control Systems
Design and specification of Fire Protection Systems

Machinery:
Pre-Start Health & Safety Review for Machine Guarding applications (trigger 2 of the Table in S.7 of Ontario Regulation 851)
Custom machine guarding design (perimeter fencing or 'form-fitting' sheet metal / Lexan / wiremesh guards)
Electrical safety circuit design for control reliability
PLC programming, especially relating to safety circuits (safety PLC’s and programmable safety relays). Pneumatic / hydraulic circuit design for control reliability
Safe distance and machine stop time analysis. Responses to Ministry of Labour orders such as “54(1)K,” and “54(1)L,” orders, which require a Certificate of “Not Likely to Endanger” before the machine can operate again. Mechanical Design & Engineering. Hazard warning labels. Turnkey safety integration projects, where CCP Engineering can design, supply, manage and sign-off on the safety upgrade project. Equipment (other than machinery):
Pre-Start Health & Safety Review for Lifting Devices And Automotive Lifts (trigger 7 of the Table in S.7 of Ontario Regulation 851)
Pre-Start Health & Safety Review for Racking Systems (trigger 3 of the Table in S.7 of Ontario Regulation 851)
Lockout / tagout review, including the evaluation of equipment and generation of procedures to meet the requirements of CSA Z460
Structural analysis of cranes and lifting devices. Laser Safety Reviews per CAN/CSA E60825-1, CSA Z386 and CAN/CSA-C22.2 NO. 60601-2-22-01. Processes:
Pre-Start Health & Safety Review for Foundries (trigger 6 of the Table in S.7 of Ontario Regulation 851)
Pre-Start Health & Safety Review for Industrial Hygiene (trigger 8 of the Table in S.7 of Ontario Regulation 851)
Warehouse safety including: forklift, fire protection, dock safety, racking damage assessment and good practices
Workwell audits
Ergonomic analysis to increase productivity and improve occupational health and safety. Industrial hygiene and noise audits. Ventilation studies including:
Dilution Ventilation Design
Heating, Ventilation & Air Conditioning,
Heat Loss Calculations,
Duct Design,
Fume Extraction Systems,
Air Compressors and Dryers. Construction Safety

Construction Safety, including:
Detailed work procedures and instructions in compliance with OHSA. Safety policy manuals. Engineered repair procedures. Safe welding procedures and practices. Site inspection and site safety administration. Mechanical access equipment including mast climbing work platforms,
Worker-pedestrian and motorized vehicle awareness training: worker-vehicle interaction, increased "people" awareness, workplace specific examples, rigging and hoisting practice, slings and rigging inspection, and lift equipment inspection. Inspection and preparation of repair procedures for construction equipment such as backhoes, skid steers, scrapers, bulldozers, concrete pumps, piling rigs, etc. Certification of truck-mounted aerial devices, elevating work platforms, tower, mobile and overhead cranes, forklifts and mast climbers. Design and certification of fall arrest, rigging systems, anchorage connections and static lines. Design and analysis of ladder systems. Equipment inspection and non-destructive testing. Crane operations, engineered lifts, rigging, hoisting and associated material handling including safe crane operations. Safety audits for construction machinery, including:
Tunnel boring machines,
Mobile Cranes,
Mining vehicles,
Aerial devices,
Elevating work platforms,
Tower Cranes
Tower Crane mechanical & electrical inspections. Note: the Ministry of Labour in Ontario has placed a great deal of emphasis on the requirement for mechanical & electrical inspection (not just structural). General

Development of Purchasing Specifications to ensure that safety is built into the design phase or that the responsibility for safety and compliance are shifted to the equipment supplier. Forensic Engineering & Litigation Support services, including:
Accident investigation and failure analysis for industrial, construction and mining accidents
Fire and explosion investigations
Accident reconstruction and computer animation of accidents
Litigation support
Expert witness services in court
Field testing of control systems on machinery, vehicles, etc. In-house facilities to carry out strength testing, slip testing, hardness testing, and other mechanical tests. Collaborations with metallurgical testing facilities
Structural Analysis / Finite Element Analysis , including:
Static / dynamic / thermal stress analysis
Linear and non-linear analysis
Mechanical event simulation
Training on-site or off-site in all aspects of safety and legal issues in relation to industrial establishments and construction projects. Health & Safety Programs (manuals, training, monitoring). Integration of Safety Information into Manuals. JHSC setup and coaching. Accident/Incident Investigations & Training. WHMIS training and development. CAD and Solid Modeling of parts, assemblies and bill of materials; for machines, mechanical equipment, piping layouts and ducting layouts.
3D scanning and modeling using the technique of Photogrammetry
Project Management including Budget Estimates, Critical Path Scheduling, Procurement, Specifications, Tender Administration, Contractor Selection, Progress Payments, Project Documentation, Filing for Various Permits. Construction Management including Site Management, Procurement, Specifications Adherence, Contractor Co-ordination, Quality Assurance, Schedule Adherence. Confined Space assessment and development of entry requirements. Crane and Elevating Work Platform Inspection & Engineering, including:
Code compliance testing & certification
Annual inspection
Repair procedures
Load chart certification
Special Access Elevating Devices , with services including:
Engineering design analysis
Control circuit reviews for safety
Design permit application support
Field reviews for applicable Code compliance
Field physical testing
Final commissioning reviews
Material hoist reviews
Fall Protection System Design & Engineering
Complete custom design of fall protection systems including fall arrest, fall restraint, travel restraint, etc. for a wide range of applications. Full turnkey services including design and installation by experienced professionals. Peer reviews of existing systems designed and installed by others. Prepare procedures for operating, maintenance, fall protection, and confined space. Annual inspection and load testing of fall arrest and fall protection systems. Non-destructive testing and re-certification. HAZOP , Risk Analysis. Feasibility Study, Compliance & Risk Engineering
Safety Integrity Level (SIL) Assessment per EN62061, ISA 84.01 and IEC 61511 standards. Performance Level (PL) Assessment per ISO 13849-1.

03/06/2017

The new CSA Z432 machine guarding Standard is out and has some interesting improvements. It is only 8 pages longer than the previous version but actually provides more useful information and...

12/06/2016

On November 23, 2016 the Ministry of Labour provided more information on "How to Apply Section 7 of the Industrial Establishments Regulation" These web pages provide more information on important questions such as: "How do I get an exemption from Pre-Star

01/25/2016

The Ministry of Labour announced a blitz over the period of January 18 – February 26, 2016, focusing on hazards that could lead to serious worker injuries, such as amputations of limbs, or...

01/20/2015

RSS Feed

12/31/2014

CCP Engineering is proud to announce the launch of an integration company focused on safety upgrades of industrial equipment. In our new 2800 sq.ft. facility we have mechanical and electrical...

Address

Brampton, ON

Telephone

+12898012899

Website

https://plus.google.com/106260893714945630253/posts

Alerts

Be the first to know and let us send you an email when CCP Engineering Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CCP Engineering Inc.:

Share