NPG Water Services

NPG Water Services Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from NPG Water Services, Llangammarch Wells.
(2)

Leak detected and repaired in brecon today
29/05/2024

Leak detected and repaired in brecon today

Recent water project complete renewing an old 3inch cast iron main with new 90mm HDPE.
10/03/2024

Recent water project complete renewing an old 3inch cast iron main with new 90mm HDPE.

12/02/2024

Leak temporary repaired with 3inch wrap around, Main to be replaced at a later date.

Valve installed on 3inch cast iron main, To assist with leak detection.
05/02/2024

Valve installed on 3inch cast iron main, To assist with leak detection.

Recent job down on the Glanusk Estate ready for the Green Man Festival3 road crossings using a 75mm and 45mm impact mole...
09/07/2023

Recent job down on the Glanusk Estate ready for the Green Man Festival
3 road crossings using a 75mm and 45mm impact mole.

08/05/2023

Currently looking for a qualified Plumber.
- Full time or Part time available
- Driving license essential
- PM for more details

Latest water project finished on the royal Welsh showground, Old cast-iron replaced with new HDPE pipe.
02/03/2023

Latest water project finished on the royal Welsh showground, Old cast-iron replaced with new HDPE pipe.

First phase complete ✅ on latest water main project.
27/01/2023

First phase complete ✅ on latest water main project.

09/01/2023

Currently looking for a general labourer to cover around 4-6 weeks work initially. Pm for more details

Emergency call out for a leak running at 9 Cube a hour
24/11/2022

Emergency call out for a leak running at 9 Cube a hour

Leak detected today: Using our Cscope pipe tracer to find the route of the pipe and then our ground mic to pinpoint leak
19/10/2022

Leak detected today:
Using our Cscope pipe tracer to find the route of the pipe and then our ground mic to pinpoint leak

Leak found in boughrood, Using our ground mic
25/09/2022

Leak found in boughrood, Using our ground mic

Recent job, Cutting in a valve on 90mm HDPE leg to assist with leak detection whilst keeping a covid vaccination centre ...
27/02/2022

Recent job, Cutting in a valve on 90mm HDPE leg to assist with leak detection whilst keeping a covid vaccination centre in water.

26/02/2022

Job from yesterday, New 32mm service pipe moled under road using our 45mm impact mole.

03/02/2022

Trace and repair on a 3inch water main which was leaking at 6 cube a hour !

01/02/2022

Tough run today, Hit some hard ground but managed to get through.

23/11/2021

Emergency call out today, This leak was running at 1,200 litres per hour.

Job for last week, -Dig out to locate stop taps and replace with 5 new water meters to monitor each property.
16/11/2021

Job for last week,
-Dig out to locate stop taps and replace with 5 new water meters to monitor each property.

Couple of road crossings yesterday  In Llanwrtyd  and Brecon, completed with our 45mm mole Trenchless Sales UK Ltd
16/07/2021

Couple of road crossings yesterday In Llanwrtyd and Brecon, completed with our 45mm mole Trenchless Sales UK Ltd

Recent job, Replacement of old 3inch cast-iron to a new 90mm HDPE main
28/06/2021

Recent job, Replacement of old 3inch
cast-iron to a new 90mm HDPE main

Another leak found and repaired on 3inch cast iron main.
09/06/2021

Another leak found and repaired on 3inch cast iron main.

23/05/2021
Call out to leak on a 80mm PVC water main.
23/05/2021

Call out to leak on a 80mm PVC water main.

Emergency call out to leak in Knighton market last week,-Locate water leak -Excavate and lay new 50mm water ServiceG.R.M...
12/04/2021

Emergency call out to leak in Knighton market last week,
-Locate water leak
-Excavate and lay new 50mm water Service
G.R.Morris Contractors Ltd

1,200 meters of water pipe put in on First stage of new water scheme in Brecon -Electric fusion on 50 & 32 mm MDPE pipe ...
13/03/2021

1,200 meters of water pipe put in on First stage of new water scheme in Brecon
-Electric fusion on 50 & 32 mm MDPE pipe
-Using open cut and moling techniques

Find and Repair on 4 inch water main in crickhowell last week
23/02/2021

Find and Repair on 4 inch water main in crickhowell last week

Solar pump all commissioned up and supplying good pressure and flow to tanks
13/07/2020

Solar pump all commissioned up and supplying good pressure and flow to tanks

Installing a solar water pump today, To feed a water storage tank then linked into 1500 meters of water pipe to supply d...
02/07/2020

Installing a solar water pump today, To feed a water storage tank then linked into 1500 meters of water pipe to supply drinking troughs

2 jobs completed in Llandovery today using our impact mole !
05/06/2020

2 jobs completed in Llandovery today using our impact mole !

Nice couple of days mole ploughing, Think Stephen pencil hughes has lost his tractor driving job !SOCIAL DISTANCING AT I...
26/05/2020

Nice couple of days mole ploughing, Think Stephen pencil hughes has lost his tractor driving job !
SOCIAL DISTANCING AT ITS BEST!

Address

Llangammarch Wells
LD44AF

Telephone

+447721427684

Website

Alerts

Be the first to know and let us send you an email when NPG Water Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Share


Other Llangammarch Wells travel agencies