23/05/2023
The second construction phase is coming to an end. Inside, the house is mainly finished. On the outside, only "little things" are still missing (the biggest one is finally the high voltage electricity, which we applied for ages ago, some subsections follow this, like the rain gutter). A lot was done in this construction phase: a new septic tank, new roof including insulation, complete extension of the 2nd floor, renovation 1st floor. A total of two new bathrooms, 3 bedrooms, 1 kitchen, living room. Complete new electrical, plumbing, ventilation system, air conditioning, pool and stone fences started and outside terraces made- INCREDIBLE when you read it like that😱.
In fall section 3 will come (which we have already started): balcony, finishing pool, exterior, insulation bathroom exterior and storage rooms.
Der zweite Bauabschnitt neigt sich dem Ende zu. Innen wird das Haus weitestgehend fertiggestellt. Außen fehlen am Haus nur noch „Kleinigkeiten“ (die größte davon ist endlich der Starkstrom, den wir vor Ewigkeiten beantragt haben, daran hängen einige andere Gewerke wie die Regenrinne). Viel wurde in diesem Bauabschnitt geschafft: einen neuen septischen Tank, neues Dach samt Dämmung, Komplettausbau des 2. Stockes, Sanierung OG1. Insgesamt zwei neue Bäder, 3 Schlafzimmer, 1 Küche, Wohnzimmer. Komplett neue Elektrik, Wasserleitungen, Lüftungsanlage, Klimaanlagen. Der Pool und die Gartenmauern wurden begonnen, die Terrassen gemacht. UNFASSBAR, wenn man das so ließt😱
Im Herbst kommt Abschnitt 3 (welchen wir schon angefangen haben): Balkon, Freistellung Pool, Außenanlagen, Dämmung Badezimmer außen und Lagerräume.