Egypt's HSR Project, 6th of October city-South Helwan line
#BalancedCantilever #bridge #project
We are happy to support our client Acrow Formworks Technology
in developing ACROW Balanced Cantilever Carriage.
Due to constant succession Strukturas team accumulated more than 50 years of bridge building equipment engineering legacy.
STRUKTURAS
WE MAKE IT SIMPLE!
#engineering #constructionmethods
#construction #technology
#concrete #project #productivity
#future #innovation #sustainability
#Freivorbau #Brücke
#brückenbau #spezialkonstruktion #schalungsbau
Aquilino Raimundo Linas Adomavičius
167 MSS project references worldwide since 1972
MSS - Movable Scaffolding System
Engineering legacy of Strukturas team
STRUKTURAS
WE MAKE IT SIMPLE!
#SpanBySpan #Bridge #Construction #Productivity
#Brücke #Vorschubrüstung
#brückenbau #spezialkonstruktion #schalung
#Innovation #Technology #Future
#Engineering #ConstructionMethods
#Concrete #Project #Sustainability
Aquilino Raimundo Linas Adomavičius
🎬 VIDEO: Wing Form Traveller 🎥
🔄7 DAY TYPICAL CYCLE in 30 seconds❗
#Bridge #Construction #Productivity
✅ The Wing Form Traveller system is used to cast the deck wings in a second stage.
✅ The Wing Form Traveller’s length can be specifically sized to each project. Normally, sections up to 15 meters in length are cast.
✅ Wing Form Traveller system is tailor made for every single bridge.
As You can see in the drawings and pictures, Strukturas as WFT is very light, simple and optimized structure.
STRUKTURAS
WE MAKE IT SIMPLE!
#Innovation #Technology
#Future #Engineering #ConstructionMethods
#Concrete #Project #Sustainability
#Brücke
Aquilino Raimundo
Linas Adomavičius
🎬 VIDEO: Underslung SELF-LAUNCHING MSS 🎥
🔄14 DAY TYPICAL CYCLE in 1,5 MINUTES❗
#SpanBySpan #Bridge #Construction #Productivity
↩ With the SELF-LAUNCHING version of MSS, cranes are not needed for relocating the supporting brackets because the MSS is equipped with a specific device for carrying out this operation.
✅ The supporting brackets are suspended from a transport bogie, which moves them along the main girders and the noses with the aid of electric winches included in the system.
STRUKTURAS
WE MAKE IT SIMPLE!
#Brücke #Vorschubrüstung
#Bridge #Innovation #Technology
#Future #Engineering #ConstructionMethods
#Concrete #Project #sustainability
Aquilino Raimundo
Linas Adomavičius
⁉️14 DAYS typical cycle in 30 SECONDS 🎥
#SpanBySpan #Bridge #Construction
Overhead Movable Scaffolding System - MSS
STRUKTURAS
WE MAKE IT SIMPLE!
Aquilino Raimundo
Linas Adomavičius
#Brücke #Vorschubrüstung
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability #Productivity
#BalancedCantilever #Bridge #Construction
🏗 Underslung Form Traveller Ariari
Puerto Lleras, Meta, Colombia
Connecting the downtown area of Puerto Lleras with the existing Vista Hermosa county road, known as “Trocha Siete” with a bridge over the Ariari River.
It is a cable-stayed bridge with a length of 270 m, made up of spans of 70 m, 135 m and 70 m and a deck width of 11.6 m. Bridge supported by two pylons approximately 52 m high and 20 m wide at the base.
The superstructure is made up of a concrete slab that is supported on longitudinal and transverse by structural steel beams.
Balanced cantilever construction method of the deck - Cast-In-Situ with Form Travellers.
🔴 The Underslung Form Traveller solution can be adapted to different types of bridge decks, such as arch bridges and cable-stayed bridges, leaving enough room to assemble the temporary or final cable stays, and allowing easy launchback to the initial assembly position.
The external formwork of this type of Form Traveller is supported by the main structure, leaving enough room to install the pre-assembled rebar cage. When the rebar cage is pre-assembled, the Strukturas Underslung Form Traveller is the perfect choice.
🔝 Highlighs & Facts:
Segment Length: 7,75m
Length of Hammerhead: 19,9m
MAX Segment Weight: 132,7ton
MAX Width Superstructure: 12,8m
Min. Hor. Radius: R=1195m
Max Long Slope: 7,0%
Crossfall: 0%
Deflection of Main Beam: L/400
Critical Wind Speed During Launching: 20,0 m/sec
Critical Wind Speed During Concreting: 32,0 m/sec
Client: CONCREARMADO LTDA.
Project Location: Puerto Lleras, Meta, Colombia
STRUKTURAS
WE MAKE IT SIMPLE !
#ConstructionMethods #Innovation #Technology
#Future #Engineering #Sustainability
#Concrete #Project #Productivity
#Freivorbau #brücke
Linas Adomavičius
Aquilino Raimundo
🏗 ♻ Span by span construction of the new
TB Heubach bridge
using movable scaffolding system - MSS
#SpanBySpan #Bridge #Construction
✅ The Heubach valley bridge consists of two parallel structures, which are demolished and rebuilt in two construction phases.
Demolition of the old bridge and the construction of the new Heubach bridge was awarded by Die Autobahn to the contractor Implenia .
✅ Movable Scaffolding System ensures the minimal intervention to existing infrastructure.
✅ Using MSS for new construction allows the existing highway and the road bellow to remain open throughout most of the construction period.
✅ After finished demolition the same MSS is also used for the construction of the new TT section decks.
This approach saves time and resources, making the construction process more efficient.
✅The MSS installation works was carried out by professional site team from Strukturas.
⁉️☝️Highlights & Facts:
Max Span: 48,0m
Max MSS Span: 39,1m
Weight of the concrete bridge: Approx 426 KN/m
Width Of Bridge Slab: 18.3m
Min. Hor. Radius: R= 2500m
Max Crossfall: 4.53%
Max Long Slope: 0,63%
Deflection of MSS: MAX L/400
The replacing of old bridge superstructures with MSS is an effective and safe technical solution
❗☝ 💡 If you would like to learn more about bridge replacement using Movable Scaffolding System, send us a private message and we will contact you as soon as possible
STRUKTURAS
WE MAKE IT SIMPLE!
#Brücke #Vorschubrüstung
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability #Productivity
Aquilino Raimundo
Linas Adomavičius
#Brücke #Vorschubrüstung #Rückbau
#SpanBySpan #Bridge #Demolishing
using the
MSS - Movable Scaffolding System
Contractors Eiffage , Implenia and Arlt Bauunternehmen GmbH are using this demolition method for their client Die Autobahn
The demolition of the old bridge with MSS is an effective and safe solution:
- Minimal intervention to existing infrastructure.
- Using MSS for demolition allows the existing highway to remain open throughout all of the demolishing period.
- MSS allows the existing railway to remain open throughout most of the demolishing period.
- The MSS could be assembled on the ground and later could be lifted with 4 strand jacks.
- After finished demolition MSS could be lowered with 4 strand jacks on the ground for safe and productive MSS dismantling.
- The challenging MSS installation conditions can be carried out by professional site crew from Strukturas.
- The engineering challenge is to avoid an overload of the superstructure during the demolition and to ensure a safe load transfer within the load capacity of the MSS.
- After the demolition this same MSS could also be used for the construction of the bridge deck. This approach saves time and resources, making the construction process more efficient.
If you would like to learn more about bridge demolition using Movable Scaffolding System, send us private message and we will contact you as soon as possible!
STRUKTURAS
WE MAKE IT SIMPLE!
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability #Productivity
Aquilino Raimundo
Linas Adomavičius
⚒Span by span demolition of the
TB Heubach bridge
using movable scaffolding system - MSS
#SpanBySpan #Bridge #Demolishing
✅ The Heubach valley bridge consists of two parallel structures, which will be demolished and rebuilt in two construction phases.
✅Bridge info:
Year of construction of existing building - 1968
Length - 184 meters
Width - 16.5+16.5 meters
Bridge spans - 30,6 + 37,5 + 45 + 37,5 + 30,6 meters
Max. height above ground - 18 meters
Demolition of the old bridge and the construction of the new Heubach bridge was awarded by Die Autobahn to the contractor Implenia .
✅ Movable Scaffolding System ensures the minimal intervention to existing infrastructure.
Using MSS for demolition allows the existing highway and the road bellow to remain open throughout most of the demolishing period.
✅ After finished demolition this same MSS will also be used for the construction of the bridge’s new TT section decks.
This approach saves time and resources, making the construction process more efficient.
✅ The challenging conditions on the job site was not easy for Strukturas MSS assembly team to operate.
✅The engineering challenge - to avoid an overload of the superstructure during the demolition and to ensure a safe load transfer within the load capacity of the MSS.
⁉ Highlights & Facts:
Max Span: 45,0m
Max MSS Span: 45,0m
Weight of the concrete bridge: Approx 250 KN/m
Width Of Bridge Slab: 16.5m
Min. Hor. Radius: R= 2500m
Max Crossfall: 2.1%
Max Long Slope: 0,63%
Deflection of MSS: MAX L/400
The demolition of old bridge structures with MSS is an effective and safe solution for many bridges
❗☝ 💡 If you would like to learn more about bridge demolition using Movable Scaffolding System, send us a private message and we will contact you as soon as possible
STRUKTURAS
WE MAKE IT SIMPLE!
#Brücke #Vorschubrüstung #Rückbau
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability #Productivity
PAN BY SPAN DEMOLITION OF THE TB KRONDORF BRIDGE ⚒ USING MOVABLE SCAFFOLDING SYSTEM - MSS
⛔ SPAN BY SPAN DEMOLITION OF THE TB KRONDORF BRIDGE ⚒
USING MOVABLE SCAFFOLDING SYSTEM - MSS
#SpanBySpan #Bridge #Demolishing
✅ The replacement of the 50-year-old bridge was absolutely necessary due to the overall poor condition of the structure and the load-bearing reserves that are no longer sufficient for today's traffic conditions.
✅Bridge info:
Year of construction of existing building - 1971
Length - 475 meters
Bridge spans - 45 + 7 x 55 + 45 meters
Height above ground - 40.30 meters
Demolition of the the old bridge and the construction of the new KRONDORF was awarded by Die Autobahn to the contractors Eiffage Infra-Süd GmbH & Eiffage Infra-Bau SE & Eiffage Infra-nordwest GmbH.
✅ Movable Scaffolding System ensures the minimal intervention to existing infrastructure.
Using MSS for demolition allows the existing highway remain open throughout most of the demolishing period. The northbound deck is being demolished as the traffic is running on the southbound deck.
✅ After finished demolition MSS was lowered with 4 strand jacks, later the the MSS was disassembled on the ground.
✅ The total weight of each of the 55m long spans is 1400 tons ❗
✅The engineering challenge - to avoid an overload of the superstructure during the demolition and to ensure a safe load transfer within the load capacity of the MSS.
⁉ Highlights & Facts:
Max Span: 55,0m
Max MSS Span: 55,0m
Weight of the concrete bridge: Approx 255 KN/m
Width Of Bridge Slab: 15.2m (MAX)
Min. Hor. Radius: R= 3000m
Max Crossfall: 1.5%
Max Long Slope: 2,6%
Deflection of MSS: MAX L/400
The demolition of old bridge structures with MSS is an effective and safe solution for many bridges
❗☝ 💡 If you would like to learn more about bridge demolition using Movable Scaffolding System, send us a private message and we will contact you as soon as possible
STRUKTURAS
WE MAKE IT SIMPLE!
#Brücke #Vorschubrüstung #Rückbau
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engi
⛔ DEMOLITION OF THE WERNTAL BRIDGE ⚒
USING MOVABLE SCAFFOLDING SYSTEM - MSS
#SpanBySpan #Bridge #Demolishing
✅ The existing Werntalbridge on the highway A7 north of Würzburg (Germany) had been demolished and replaced with a new bridge. The bridge is 460 m long and made with two parallel decks with 8 spans. Moreover, the maximum span length is 59,5 m and the deck width is 15,2 m.
Demolition of the the old bridge and the construction of the new Werntalbridge was awarded by Die Autobahn to the contractor Arlt Bauunternehmen GmbH .
✅ Movable Scaffolding System ensures the minimal intervention to existing infrastructure.
Using MSS for demolition allows the existing highway and the railway below the deck to remain open throughout most of the demolishing period.
The MSS was assembled on the ground, later the MSS was lifted with 4 strand jacks and finally launched to the first span.
✅ The total weight of each of the 59,5m long spans is 1600 tons ❗
✅ The engineering challenge - to avoid an overload of the superstructure during the demolition and to ensure a safe load transfer within the load capacity of the MSS.
⁉ Highlights & Facts:
Max Span: 59,445m
Max MSS Span: 59,445m
Weight of Superstructure: Approx 267 KN/m
Width Of Bridge Slab: 15,2m (MAX)
Min.Hor.Radius: R= NA
Max Crossfall: 2,5%
Max Long Slope: 2,0%
Deflection of MSS: MAX L/400
☝ The demolition of old bridge structures with MSS is an effective and safe solution for many bridges
❗☝ 💡 If you would like to learn more about bridge demolition using Movable Scaffolding System, send us a private message and we will contact you as soon as possible
STRUKTURAS
WE MAKE IT SIMPLE!
#Brücke #Vorschubrüstung #Rückbau
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability #Productivity
Aquilino Raimundo
Linas Adomavičius
Gerald Desmond Bridge - replacement project
Long Beach, California, USA
#Bridge #Construction #Productivity
The main structure is resolved by means of a cable-stayed bridge with a 305-m. long principal span at 61 m. over the Back Channel and two 152-m. long end spans. The project was designed with two 155-metre maximum height, single-shaft towers, 90 m. above the deck.
The deck is 47 m. wide and consists of longitudinal metal beams at the ends and transversal metal beams spaced at five meters.
The access viaducts to the stayed section are 900 m long on the west side and 1,155 m. long on the east side. These viaducts mostly have been executed onsite with a movable scaffolding system (MSS).
Strukturas designed and supplied 2 underslung Movable Scaffolding Systems - Orange MSS and Blue MSS
The characteristics of the Movable Scaffolding Systems:
- Maximum span: 69.8 m
- Maximum span MSS: 57.78 m
- Capacity: 51.23 Tn/m and 46.49 Tn/m
- Maximum deck width: 25.39 m
- Deck concrete casting in two phases
- Minimum radius: 6401 m
- Maximum transversal slope: 2.0%
- Maximum longitudinal slope: 5.0%
- Deformations: L/400
STRUKTURAS
WE MAKE IT SIMPLE!
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability
Øyvind Karlsen
Aquilino Raimundo
Linas Adomavičius
Movable Scaffolding System
Gerald Desmond Bridge - replacement project
Long Beach, California, USA
#Bridge #Construction #Productivity
The main structure is resolved by means of a cable-stayed bridge with a 305-m. long principal span at 61 m. over the Back Channel and two 152-m. long end spans. The project was designed with two 155-metre maximum height, single-shaft towers, 90 m. above the deck.
The deck is 47 m. wide and consists of longitudinal metal beams at the ends and transversal metal beams spaced at five meters.
The access viaducts to the stayed section are 900 m long on the west side and 1,155 m. long on the east side. These viaducts mostly have been executed onsite with a movable scaffolding system (MSS).
Strukturas designed and supplied 2 underslung Movable Scaffolding Systems - Orange MSS and Blue MSS
The characteristics of the Movable Scaffolding Systems:
- Maximum span: 69.8 m
- Maximum span MSS: 57.78 m
- Capacity: 51.23 Tn/m and 46.49 Tn/m
- Maximum deck width: 25.39 m
- Deck concrete casting in two phases
- Minimum radius: 610 m
- Maximum transversal slope: 2.0%
- Maximum longitudinal slope: 5.0%
- Deformations: L/400
STRUKTURAS
WE MAKE IT SIMPLE!
#Bridge #ConstructionMethods
#Concrete #Project #Innovation
#Engineering #Technology
#Sustainability
Aquilino Raimundo
Linas Adomavičius
Madeira Isle Formtravellers
Two Formtravellers pairs used in Madeira Isle project by our client AFAVIAS SA.
Strukturas entered the world of virtual site tours! Now at the confort of your office you can visit our virtual job sites! Please consult us about Bridge Building Equipment solutions and enjoy the tools we have at your disposal.
Nice job! Congratulations. Well done guys!
FORMTRAVELLERS AT ZENICA SITE
Cantilever Bridge under construction using Strukturas FT system.