Please join us in welcoming the newest members of the Barletta family! We are thrilled to have you join our team!
Powerful things can happen when we work together. Take a look! The Cutter Head removal from the Receiving Shaft located at our current project location: CSO 2005 Pawtucket Tunnel in Rhode Island!
#MotivationMonday #CurrentProjectProgress
Narragansett Bay Commission
Stantec Bay Crane Companies
WE HAVE A BREAKTHROUGH! Spanning over two miles long, the Phase III CSO Program- Design Build Pawtucket Tunnel hit a breakthrough on February 15, 2024! Narragansett Bay Commission #ConstructionSite #TunnelConstructionWork #FeatureFriday #RhodeIsland
A look behind the scenes of the making of The North Bank Pedestrian Bridge in 2012
📍Boston, MA
#NorthBankBridge #BridgeConstruction #Timelapse #BehindTheScenes
The Henderson Bridge opened on November 17, 2023. Construction of the new 1,315-foot bridge is the highlight feature of this project, which also includes reconstruction of the Providence and East Providence roadway approaches to the bridge. Substantial Completion is projected for 11/21/2024 and Final Completion is projected for 6/1/2025. Operations include full demolition of the existing superstructure, partial demolition of the substructure, construction of temporary pier shoring towers, new steel pier caps and new steel girder superstructure, new concrete columns on existing piers, construction of new pile supported concrete abutments and return walls, mechanically stabilized earth walls, and bridge approach barriers supported on moment slabs. With both the existing and new bridge spanning the Seekonk River and connecting Providence to East Providence a significant amount of marine work is required. Additional work includes removal of the Massasoit Avenue interchange ramp system and construction of a multi-lane roundabout, roadway and shared-use-path construction, as well as handling, hauling, stockpiling and management of contaminated soils, a new storm drainage system, milling and overlay of paved areas, and full depth HMA installations. #HendersonBridge #ProvidenceRI #EastProvidenceRI #RhodeIsland
Motivation Monday: Update from the newly completed Section of the Middlesex Turnpike (MTP) Roadway Improvements Project at the intersection of MTP and Lexington Rd. in Billerica, MA.
MTP improvements include:
- Widening of the MTP to accommodate two lanes of travel in each direction, code compliant sidewalks and bicycle lanes
- Newly installed traffic signal system, with automated sensors to optimize traffic signal timing
#MotivationMonday #DroneFootage #AerialView #MiddlesexTurnpike #BillericaMA #MassDOT
Substantial Completion: June 30, 2023 Final Completion: December 29, 2023 Feature Friday: Located in the Union Square area of Somerville, MA, the project consisted of major underground utility upgrades to improve drainage and reduce flooding in a bustling city neighborhood. The scope included installation of a half-mile-long, 14-ft wide x 6-ft tall storm water box culvert drainage system, cleaning and CIPP lining of existing sewers ranging in size from 12-inch diameter to 84-inch diameter, installation of new 24-inch and 42-inch diameter PVC sewers, 5000 feet of new water mains, and a new street lighting system. Above the ground, elevated cycle tracks and green pavement markings were added for biker safety. New green infrastructure including porous pavement, soil cells, storm water planters, and bioretention basins were installed to collect and reuse storm water runoff in planting areas. Additionally, the project improved three existing pier foundations of McGrath Highway by installing micropiles down to bedrock and encompassing the existing shallow footings in the new pile caps. #UnionSquare #SomervilleMA
On September 30, 2023, Barletta delivered and installed a new Central Instrument House (CIH) as part of the Red Line and Orange Line Signals Upgrades Project for Massachusetts Bay Transportation Authority - MBTA . The CIH is 65FT long and 12FT wide weighing approximately 60,000 pounds! Four telescoping boom cranes were required to set the CIH due to the low clearance of the overpass. The new CIH allows for an advanced upgrade to the MBTA train control systems with a new audio frequency track circuit (AFTC) signal system.
#transformationtuesday #mbta #mbtaredline #mbtaorangeline #constructionsite #construction #bostonconstruction
MBTA - ROBERT STREET BRIDGE TIMELAPSE
Check out this timelapse video of the MBTA Roberts Street ABC Rail Bridge Replacement Project completed by BHD last September.
Aside from just looking cool, this project is significant because of its impact. With executed precision in tight parameters while following the utmost safety precautions, the complete removal and reinstallation of this bridge was done within a weekend with minimal disruption to the Commuter Rail Service.
The use of self-propelled modular transporters (SPMT) to roll the new bridge in, just shows the tip of the iceberg when it comes to BHD's innovation, equipment capacity, crew's skill, and capabilities.
Also unseen, are the extensive utility relocation, reconstruction, and support efforts that took place with @mbta_cr coordination to upgrade the final line and surface track.
#heavycivil #railbridge #boston #roslindale #spmt #mbta #mbtacommuterrail #railfanning #railroadtracks #railroads_of_the_usa