Another repeat customer and another bathroom having done the bathroom and kitchen in their last house we were asked to do the works needed in there new bungalow, so out with the old in with the new having found a blocked up door and a block wall attached to it that wasn’t safe we pulled it down and replaced it with a new stud wall as nothing was load bearing, then removed the old bathroom fitted a new door frame and a new bathroom, plastering by Gez bray fitted with Michael Docherty
Another repeat customer after completing both bathroom and en-suite they asked us to carry out a full kitchen remodel including removing internal walls and installing steels kitchen design as well as utility room and new floors throughout as well as moving radiators and installing new ones, the kitchen was built and supplied by Moores of Burbage including all appliances and worktops another amazing job supplied by a local company unfortunately i didn’t get many before pictures all the usual people involved Gez bray plastering MJS builders Jason bishop for electrical fitted with Michael Docherty and with help from Moores of Burbage.
Bathroom and en-suite update on this job unfortunately I did get pictures of the completed en-suite so only the main bathroom to check out suite supplied by simply bathrooms Hinckley fitted with Michael Docherty