Helping out the boss 👷🏼♂️
This is certainly one of the more exciting jobs we’ve worked on for a while. Awesome to see the Metung Hot Springs inching closer to fruition. Couldn’t help but get out the drone and have a play in this picturesque location on this stunning winters day.
Pulling the 355mm pipe back through the bore hole
Successful bore with our Vermeer 3650 to install a 355mm water main under the road and irrigation channel in Heyfield for the Experts in irrigation and farming at Maffra Poly & Pumps.
240 metres of 450mm HDPE pipe being pulled through after a successful bore for a Water Main Replacement at Eagle Point for
East Gippsland Water and Friths Plumbing and Gasfitting
🎉🎉2 YEARS 🎉🎉
Thankyou to all our loyal customers for your support in the past 2 years who continue to trust us to get the job done!
Glen doing what he does best 👍🏻Thanks Brayden for the commentary!