Pier Lake Cabin

Pier Lake Cabin New construction northwoods vacation cabin on 10 wooded acres with 350ft of frontage on the east shoreline of Pier Lake.

Sneak peek at the downstairs bathroom. In love with the natural stone sink 🌿
09/24/2024

Sneak peek at the downstairs bathroom. In love with the natural stone sink 🌿

Peaceful evenings at Pier Lake.
09/20/2024

Peaceful evenings at Pier Lake.

Good Morning 🪷
07/27/2024

Good Morning 🪷

Beautiful sunset tonight
06/26/2024

Beautiful sunset tonight

The interior is starting to take shape with some of our nature-inspired finishes.
02/28/2024

The interior is starting to take shape with some of our nature-inspired finishes.

Drywall is done and painted which means we get to start installing finishes. A couple months left for the interior work,...
02/01/2024

Drywall is done and painted which means we get to start installing finishes. A couple months left for the interior work, then a few exterior projects and we'll be ready for some summer days on the lake.

Finished up all the siding, soffit and fascia, and final roof pieces this week. One more patio door and, if the weather ...
11/05/2023

Finished up all the siding, soffit and fascia, and final roof pieces this week. One more patio door and, if the weather cooperates, some painting to complete our exterior work.

The last couple weeks we finished some siding, started some painting, cut out a 7000sf gravel parking area, and the elec...
10/15/2023

The last couple weeks we finished some siding, started some painting, cut out a 7000sf gravel parking area, and the electrician finished the electrical rough-in. The hvac team is coming next week to install the furnace and heat pump along with the propane tank and we should be ready for the northwoods winter.

Done with framing; starting electric, hvac, plumbing, and finishing siding this week. Enjoying the colors and hoping to ...
10/02/2023

Done with framing; starting electric, hvac, plumbing, and finishing siding this week. Enjoying the colors and hoping to be done with exterior projects before winter.

Wall framing is complete waiting for the trusses to be delivered to install the roof.
08/25/2023

Wall framing is complete waiting for the trusses to be delivered to install the roof.

We worked on finishing up the second floor framing. Installing a pair of 18" LVLs along with the remaining floor joists,...
08/20/2023

We worked on finishing up the second floor framing. Installing a pair of 18" LVLs along with the remaining floor joists, subfloor and all the second floor walls. The western views from the top floor are amazing. The trusses are being shipped to the site this week and we'll be able to put a roof on and close in the cabin.

First floor framing and sheathing done. We also started second floor joist & subfloor installation.Next week it's second...
08/10/2023

First floor framing and sheathing done. We also started second floor joist & subfloor installation.Next week it's second floor framing.

The monolithic slab was poured today for the new cabin build and it turned out perfect.  Framing will be starting soon. ...
07/23/2023

The monolithic slab was poured today for the new cabin build and it turned out perfect. Framing will be starting soon. Thanks to Rick, Mike, Troy, and Jason for all your hard work.

After a long winter of delays, we are back to work on the property.  Septic tanks went in today and the well should be g...
06/08/2022

After a long winter of delays, we are back to work on the property. Septic tanks went in today and the well should be going in next week.

Clearing land and staking out the cabin location.
09/10/2021

Clearing land and staking out the cabin location.

Address

5601 E Pier Lake Road
Minocqua, WI
54564

Telephone

+16083545577

Website

Alerts

Be the first to know and let us send you an email when Pier Lake Cabin posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pier Lake Cabin:

Share