The Hill Residence - Koh Lanta

The Hill Residence - Koh Lanta 14 units 1-3 bedrooms. Make your best investment in Koh Lanta, Thailand.

Eight Type B with 2 bedrooms
Eight Type A with 3 bedrooms
Common pool with option of private pool as well.

Poolvilla A4 completed. Open for rent 7 Nov-31 Dec. Monthly rental only.
14/09/2024

Poolvilla A4 completed. Open for rent 7 Nov-31 Dec. Monthly rental only.

Hill B4, two bedrooms, two bathrooms now completed. This is for sale! Meanwhile we will rent it out for monthly stay.
03/09/2024

Hill B4, two bedrooms, two bathrooms now completed. This is for sale! Meanwhile we will rent it out for monthly stay.

Hill A5 now ready to rent out. Owner of this unit is very satisfied for all hard work put into this cute one-bedroom-uni...
03/09/2024

Hill A5 now ready to rent out. Owner of this unit is very satisfied for all hard work put into this cute one-bedroom-unit with big terrace and a balcony on each end.

Update 26 May 2024. Unit B1 SOLD so we started piling few days ago. A5 SOLD - almost completed after four months of work...
26/05/2024

Update 26 May 2024. Unit B1 SOLD so we started piling few days ago. A5 SOLD - almost completed after four months of work. Making gutter to lead water away during heavy raining. Have a look;

Äntligen Villa B3 helt klar med nya foton och redo för uthyrning
06/02/2024

Äntligen Villa B3 helt klar med nya foton och redo för uthyrning

Two-story building with two bedrooms and two bathrooms located couple of minutes from the main village Saladan. Lo Duyong is the first village on the north-east side when coming from Saladan. The villa area is expected to be fully ready 2025 but we can offer renting for long term for those accepting...

Tomorrow our first owner will move in!They are on the plane to Krabi as we speak so exciting for them and for us to hand...
26/12/2023

Tomorrow our first owner will move in!
They are on the plane to Krabi as we speak so exciting for them and for us to hand over villa B3

Furnishing and decorating B3 to hand over in two weeks! 😅
14/12/2023

Furnishing and decorating B3 to hand over in two weeks! 😅

B3 almost done, next step is furniture and decorations. Owner move in after Xmas. B4 next door will be completed 3 weeks...
22/11/2023

B3 almost done, next step is furniture and decorations. Owner move in after Xmas. B4 next door will be completed 3 weeks later and is for sale.

From temporarily to permanent electric system!Mostly a lot of money spent on cables hidden in the ground. Is that a smar...
05/10/2023

From temporarily to permanent electric system!
Mostly a lot of money spent on cables hidden in the ground.
Is that a smart investment?😂

Hill A2 start starts to bloom, roofing at A3/A4 ongoing, design experimenting with fence indoors...
19/09/2023

Hill A2 start starts to bloom, roofing at A3/A4 ongoing, design experimenting with fence indoors...

Good progress with A3 A4 now reaching roof structure and internal stairs make it easy to walk between the floors. Garden...
20/08/2023

Good progress with A3 A4 now reaching roof structure and internal stairs make it easy to walk between the floors. Garden work with extended walkways. B3 B4 ready for inner ceilings and windows doors as next step.

Rain season and electric installation.
05/08/2023

Rain season and electric installation.

Water filters, laundry room, bar counter on balcony and garden work.
10/07/2023

Water filters, laundry room, bar counter on balcony and garden work.

Hill B3 is now sold and will be ready later this fall to hand over to the lucky family! We are now installing the roof o...
08/06/2023

Hill B3 is now sold and will be ready later this fall to hand over to the lucky family! We are now installing the roof on that building and at the same time completing the tile in the lower floor bathroom.

A new building is now born at The Hill. Unit A3 and A4 is getting its ground floor prepared. Within two months we are at...
25/05/2023

A new building is now born at The Hill. Unit A3 and A4 is getting its ground floor prepared. Within two months we are at the roof top level. You see A2 to the right where we now planted yellow palm trees recently. A2 and A3 is for sale - special offer on A2 available this month!!!

The upper floor bedrooms on B3 and B4 has a magnificent view stretching over the Mangrove Forest to the mountains on Lan...
10/05/2023

The upper floor bedrooms on B3 and B4 has a magnificent view stretching over the Mangrove Forest to the mountains on Lanta Noi. Units will be fully furnished and ready to take over in October.

Real photos on A1 will replace all rendered pictures. Here is the result. Photo credit Magnus Larsson
08/04/2023

Real photos on A1 will replace all rendered pictures. Here is the result. Photo credit Magnus Larsson

Hill A4 now sold to a family from Sweden and we start building A3/A4 next to A1/A2. Detailed planning starting now for a...
01/04/2023

Hill A4 now sold to a family from Sweden and we start building A3/A4 next to A1/A2. Detailed planning starting now for a perfect result. If you are looking for three bedroom villa, A2 and A3 are still waiting for its owners

Today we got two Coconut trees planted at the Hill A1 A2. Three meter high and heavy work involving four persons. Garden...
14/02/2023

Today we got two Coconut trees planted at the Hill A1 A2. Three meter high and heavy work involving four persons. Garden work is coming along - a part of our vision as well with a lush and green garden with bushes, flowers and trees.

While we are laying the concrete foundation for the second floor on B3/B4 we are now installing the septic tanks at A1/A...
31/01/2023

While we are laying the concrete foundation for the second floor on B3/B4 we are now installing the septic tanks at A1/A2 and prepare to connect water next week. 200 meter flexible PE pipes, water filter and first water tank just arrived.
Meanwhile the last decoration indoors at A1 is now at its final stage.

Decoration of the show unit A1 is ongoing. Internet installed and Smart-Tv and Dolby Atmos soundsystem running flawlessl...
24/01/2023

Decoration of the show unit A1 is ongoing. Internet installed and Smart-Tv and Dolby Atmos soundsystem running flawlessly. Looking forward to the tempered glass walls to be completed in the showers. Want to have a look with your own eyes - stop by for an inspection of The Hill Residence!

Hill A1 kitchen almost done. Book your viewing today and we show you the area. A2 is for sale and will be ready in six-e...
16/12/2022

Hill A1 kitchen almost done. Book your viewing today and we show you the area. A2 is for sale and will be ready in six-eight weeks. B-building first floor concrete coming up beautifully and in a month you should be able to inspect the view from the roofed balcony on the upper floor! Three sold out of 15 units.

Lots of work going on at The Hill now 😉
20/11/2022

Lots of work going on at The Hill now 😉

Progress of Type A and Type B
31/10/2022

Progress of Type A and Type B

Another unit SOLD so yesterday 20 Oct we started to prepare ground work to build B3 and B4 - exciting! At the same time ...
21/10/2022

Another unit SOLD so yesterday 20 Oct we started to prepare ground work to build B3 and B4 - exciting! At the same time we connected the sky walk with the final steps to the upper land so can now easy access A1 and A2.

"Luxury Made Accessible" - at least we're getting closer!Plastering upper floor done and electric wiring as well. Attent...
08/10/2022

"Luxury Made Accessible" - at least we're getting closer!
Plastering upper floor done and electric wiring as well. Attention to details is essential for a good result when you need to use your kitchen later. Lamps, furnitures, tiles and mixer taps, doors made to order... about billion details left... but so satisfying and creative flow :D oh... Villa B4 SOLD and construction starts in a week 🥳

Villa A1 ground floor done all plastering. Walls on upper floor will be completed in three days but have to prepare swit...
19/09/2022

Villa A1 ground floor done all plastering. Walls on upper floor will be completed in three days but have to prepare switch and outlets before plastering. Picking up bedroom floors in Krabi today arriving from Bangkok. Show villa done during November.

The plastering on internal walls on the ground floor almost done so now starting the exterior walls. Roof construction a...
06/09/2022

The plastering on internal walls on the ground floor almost done so now starting the exterior walls. Roof construction already in place and work can continue on the upper floor with the walls, even during rain. Happy with the progress. More to come...

The walls on the ground floor will be completed during the time we wait for the roof slab and beam to set another week. ...
13/08/2022

The walls on the ground floor will be completed during the time we wait for the roof slab and beam to set another week. Insulation between the double walls is a great way to keep the unit cool and quiet. Stairs between the ground and upper floor is also getting in place. We are in Bangkok at the moment to look closer at the facade material that we believe will make the unit look modern and give it a real fresh look!

16 Jul-7 Aug - lots of progress with upper floor, pillars to roof slab and beam where we poured concrete today after wat...
07/08/2022

16 Jul-7 Aug - lots of progress with upper floor, pillars to roof slab and beam where we poured concrete today after wating few days for the sky to clear from rain which happened today. But the most intersting things take place on the ground floor where we can work even during heavy rain and we started with the exterior and the interior walls. Insulation between double walls and ventilation are the things to get in place and kind of a new things for the contractor. Even door frames are mounted.

ที่อยู่

Lo Dy Young, Saladan, Koh Lanta
Krabi
81150

แจ้งเตือน

รับทราบข่าวสารและโปรโมชั่นของ The Hill Residence - Koh Lantaผ่านทางอีเมล์ของคุณ เราจะเก็บข้อมูลของคุณเป็นความลับ คุณสามารถกดยกเลิกการติดตามได้ตลอดเวลา

วิดีโอทั้งหมด

แชร์


บ้านเช่าสำหรับการท่องเที่ยวพักผ่อน อื่นๆใน Krabi

แสดงผลทั้งหมด

คุณอาจจะชอบ